X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174290613026

Well Details

Well ID: 0174290613026
Loading map...
Location: 02/13-06-017-29W4/6
Location Alias: 02/13-06-17-29 W4M
Location Alias 2: 02/13-06-017-29 W4/06
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 29
Section: 06
County/Municipality: Foothills County
Well Name: COMPTON HIR 13-6-17-29
Operator Name: Lexin Resources Ltd.
License Number: 0081898
License Date: 1980-03-28
License Status: Suspension
Spud Date: 2005-12-03
Final Drill Date: 2006-01-05
Well Total Depth: 2775.00 m
Surface Hole Latitude: 50.408160
Surface Hole Longitude: -113.983263

For data sources see[1][2]

Well History

Date Event
1980-03-28 Obtained License
1996-02-03 Well Abandoned
2005-12-27 Direction Drilling Operation Performed - Deviate
2006-01-05 Finished Drilling
2006-01-05 Well Log Performed
2006-01-05 Well Mode changed to Drilled and Cased
2006-01-06 Liner Casing Operation Performed
2006-01-07 Rig Released
2006-02-11 Perforation Treatment Performed - Jet Perforation
2006-02-11 Well Log Performed
2006-02-14 Perforation Treatment Performed - Fractured
2019-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-23 Plug Back Performed
2019-10-23 Well Log Performed
2019-10-23 Well Mode changed to Abandoned Zone
2019-10-24 Perforation Treatment Performed - Abrasa-Jet Perforation
2019-10-24 Perforation Treatment Performed - Cement Plug
2019-10-24 Plug Back Performed
2019-10-26 Perforation Treatment Performed - Cement Plug
2019-10-26 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-12-27 2285.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-11 Perforation 2751.00 2754.00 17
2019-10-24 Hydra Jet Perforation 600.00 600.20 0
2019-10-24 Hydra Jet Perforation 485.00 485.20 0
2019-10-24 Hydra Jet Perforation 458.00 458.20 0
2019-10-24 Cement Plug 1298.00 1940.00 0
2019-10-26 Cement Plug 363.00 615.00 0
2006-02-11 Perforation 2745.50 2748.50 17
2006-02-14 Fracture 2745.50 2754.00 0
2019-10-23 Packing Device Capped w/Cement 2727.00 2735.00 0
2019-10-23 Packing Device Capped w/Cement 2151.00 2159.00 0
2019-10-24 Hydra Jet Perforation 1924.00 1924.20 0
2019-10-24 Hydra Jet Perforation 1746.00 1746.20 0
2019-10-24 Hydra Jet Perforation 1701.00 1701.20 0
2019-10-24 Hydra Jet Perforation 1350.00 1350.20 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References