If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0174260103000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.398676,"lon":-113.454463,"icon":""}]} |
Location: 00/03-01-017-26W4/0 | |
Location Alias: 00/03-01-17-26 W4M | |
Location Alias 2: 00/03-01-017-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 017 | |
Meridian: 4 | |
Range: 26 | |
Section: 01 | |
County/Municipality: Vulcan County | |
Well Name: CPEC HERRON 3-1-17-26 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0352862 | |
License Date: 2006-02-27 | |
License Status: Suspension | |
Spud Date: 2006-03-01 | |
Final Drill Date: 2006-03-03 | |
Well Total Depth: 1122.00 m | |
Surface Hole Latitude: 50.398676 | |
Surface Hole Longitude: -113.454463 |
Date | Event |
---|---|
2006-02-27 | Obtained License |
2006-03-02 | Surface Casing Operation Performed |
2006-03-03 | Finished Drilling |
2006-03-03 | Well Mode changed to Drilled and Cased |
2006-03-04 | Well Log Performed |
2006-03-05 | Production Casing Operation Performed |
2006-03-05 | Rig Released |
2006-03-11 | Well Log Performed |
2006-03-15 | Perforation Treatment Performed - Jet Perforation |
2006-03-15 | Well Log Performed |
2006-07-27 | Perforation Treatment Performed - Fractured |
2006-10-12 | Well Began Production |
2006-10-12 | Well Fluid changed to Gas |
2006-10-12 | Well Mode changed to Flowing |
2007-02-18 | Well Log Performed |
2013-10-01 | Well Fluid changed to Gas |
2013-10-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-03-15 | Perforation | 1045.00 | 1047.00 | 17 |
2006-03-15 | Perforation | 869.00 | 871.00 | 17 |
2006-03-15 | Perforation | 809.00 | 811.00 | 17 |
2006-03-15 | Perforation | 794.00 | 796.00 | 17 |
2006-07-27 | Fracture | 869.00 | 871.00 | 0 |
2006-07-27 | Fracture | 809.00 | 811.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1656 | 0.0 | 0.0 | 0.0 |
2007 | 8567 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8039 | 0.0 | 0.0 | 0.0 |
2011 | 6551 | 0.0 | 0.0 | 0.0 |
For data sources see[5]