If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0174220210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.408018,"lon":-112.924929,"icon":""}]} |
Location: 00/10-02-017-22W4/0 | |
Location Alias: 00/10-02-17-22 W4M | |
Location Alias 2: 00/10-02-017-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 017 | |
Meridian: 4 | |
Range: 22 | |
Section: 02 | |
County/Municipality: Vulcan County | |
Well Name: VERITY LONGCO 10-2-17-22 | |
Operator Name: Verity Energy Ltd. | |
License Number: 0095870 | |
License Date: 1982-05-10 | |
License Status: RecCertified | |
Spud Date: 1982-05-11 | |
Final Drill Date: 1982-05-19 | |
Well Total Depth: 1464.00 m | |
Surface Hole Latitude: 50.408018 | |
Surface Hole Longitude: -112.924929 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-05-10 | Obtained License |
1982-05-19 | Finished Drilling |
1982-05-19 | Well Mode changed to Drilled and Cased |
1982-05-20 | Drill Stem Test Performed |
1982-05-21 | Drill Stem Test Performed |
1982-05-22 | Production Casing Operation Performed |
1982-06-03 | Perforation Treatment Performed - Jet Perforation |
1982-06-19 | Well Began Production |
1982-06-19 | Well Fluid changed to Crude Oil |
1982-06-19 | Well Mode changed to Flowing |
1983-12-27 | Well Fluid changed to Crude Oil |
1983-12-27 | Well Mode changed to Pumping |
1996-01-01 | Well Fluid changed to Crude Oil |
1996-01-01 | Well Mode changed to Suspended |
1996-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-10-27 | Plug Back Performed |
1996-10-27 | Well Log Performed |
1996-10-31 | Well Abandoned |
1996-10-31 | Well Fluid changed to Crude Oil |
1996-10-31 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-06-03 | Perforation | 1409.00 | 1411.50 | 13 |
1996-10-27 | Packing Device Capped w/Cement | 1392.00 | 1400.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 2122 | 0.0 | 0.0 | 0.0 |
1983 | 4248 | 0.0 | 0.0 | 0.0 |
1984 | 4882 | 0.0 | 0.0 | 0.0 |
1985 | 2673 | 0.0 | 0.0 | 0.0 |
1986 | 2894 | 0.0 | 0.0 | 0.0 |
1987 | 2326 | 0.0 | 0.0 | 0.0 |
1988 | 1823 | 0.0 | 0.0 | 0.0 |
1989 | 2046 | 0.0 | 0.0 | 0.0 |
1990 | 2253 | 0.0 | 0.0 | 0.0 |
1991 | 2407 | 0.0 | 0.0 | 0.0 |
1992 | 2479 | 0.0 | 0.0 | 0.0 |
1993 | 5959 | 0.0 | 0.0 | 0.0 |
1994 | 164 | 0.0 | 0.0 | 0.0 |
For data sources see[5]