If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0174133506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.476984,"lon":-111.689102,"icon":""}]} |
Location: 00/06-35-017-13W4/0 | |
Location Alias: 00/06-35-17-13 W4M | |
Location Alias 2: 00/06-35-017-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 017 | |
Meridian: 4 | |
Range: 13 | |
Section: 35 | |
County/Municipality: County of Newell | |
Well Name: ESSOVEN BANTRY 6-35-17-13 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0075184 | |
License Date: 1979-04-09 | |
License Status: RecCertified | |
Spud Date: 1979-05-22 | |
Final Drill Date: 1979-05-23 | |
Well Total Depth: 477.00 m | |
Surface Hole Latitude: 50.476984 | |
Surface Hole Longitude: -111.689102 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-04-09 | Obtained License |
1979-05-23 | Finished Drilling |
1979-05-23 | Production Casing Operation Performed |
1979-05-23 | Well Mode changed to Drilled and Cased |
1979-09-10 | Perforation Treatment Performed - Jet Perforation |
1979-09-18 | Perforation Treatment Performed - Fractured |
1979-09-18 | Perforation Treatment Performed - Jet Perforation |
1979-09-22 | Perforation Treatment Performed - Fractured |
1980-03-01 | Well Began Production |
1980-03-01 | Well Fluid changed to Gas |
1980-03-01 | Well Mode changed to Flowing |
1994-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-22 | Plug Back Performed |
1994-10-22 | Well Abandoned |
1994-10-22 | Well Fluid changed to Gas |
1994-10-22 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-09-10 | Perforation | 427.70 | 428.30 | 7 |
1979-09-18 | Perforation | 345.60 | 346.20 | 7 |
1979-09-18 | Perforation | 363.30 | 364.20 | 7 |
1979-09-18 | Perforation | 365.80 | 366.40 | 7 |
1979-09-18 | Perforation | 368.90 | 369.40 | 7 |
1979-09-18 | Perforation | 370.40 | 370.90 | 7 |
1979-09-22 | Fracture | 306.50 | 370.90 | 0 |
1994-10-22 | Packing Device Capped w/Cement | 278.50 | 286.50 | 0 |
1979-09-10 | Perforation | 430.90 | 432.00 | 7 |
1979-09-10 | Perforation | 441.00 | 442.50 | 7 |
1979-09-10 | Perforation | 444.00 | 444.50 | 7 |
1979-09-18 | Fracture | 427.70 | 444.50 | 0 |
1979-09-18 | Perforation | 306.50 | 307.10 | 7 |
1979-09-18 | Perforation | 319.50 | 320.10 | 7 |
1979-09-18 | Perforation | 341.60 | 342.20 | 7 |
1979-09-18 | Perforation | 344.00 | 345.20 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 7831 | 0.0 | 0.0 | 0.0 |
1981 | 8735 | 0.0 | 0.0 | 0.0 |
1982 | 3883 | 0.0 | 0.0 | 0.0 |
1983 | 6530 | 0.0 | 0.0 | 0.0 |
1984 | 8755 | 0.0 | 0.0 | 0.0 |
1985 | 8533 | 0.0 | 0.0 | 0.0 |
1986 | 7033 | 0.0 | 0.0 | 0.0 |
1987 | 7490 | 0.0 | 0.0 | 0.0 |
1988 | 8680 | 0.0 | 0.0 | 0.0 |
1989 | 7981 | 0.0 | 0.0 | 0.0 |
1990 | 8347 | 0.0 | 0.0 | 0.0 |
1991 | 7796 | 0.0 | 0.0 | 0.0 |
1992 | 8712 | 0.0 | 0.0 | 0.0 |
1993 | 8261 | 0.0 | 0.0 | 0.0 |
1994 | 6551 | 0.0 | 0.0 | 0.0 |
For data sources see[5]