X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174133506000

Well Details

Well ID: 0174133506000
Loading map...
Location: 00/06-35-017-13W4/0
Location Alias: 00/06-35-17-13 W4M
Location Alias 2: 00/06-35-017-13 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 13
Section: 35
County/Municipality: County of Newell
Well Name: ESSOVEN BANTRY 6-35-17-13
Operator Name: Imperial Oil Resources Limited
License Number: 0075184
License Date: 1979-04-09
License Status: RecCertified
Spud Date: 1979-05-22
Final Drill Date: 1979-05-23
Well Total Depth: 477.00 m
Surface Hole Latitude: 50.476984
Surface Hole Longitude: -111.689102

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-09 Obtained License
1979-05-23 Finished Drilling
1979-05-23 Production Casing Operation Performed
1979-05-23 Well Mode changed to Drilled and Cased
1979-09-10 Perforation Treatment Performed - Jet Perforation
1979-09-18 Perforation Treatment Performed - Fractured
1979-09-18 Perforation Treatment Performed - Jet Perforation
1979-09-22 Perforation Treatment Performed - Fractured
1980-03-01 Well Began Production
1980-03-01 Well Fluid changed to Gas
1980-03-01 Well Mode changed to Flowing
1994-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-22 Plug Back Performed
1994-10-22 Well Abandoned
1994-10-22 Well Fluid changed to Gas
1994-10-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-10 Perforation 427.70 428.30 7
1979-09-18 Perforation 345.60 346.20 7
1979-09-18 Perforation 363.30 364.20 7
1979-09-18 Perforation 365.80 366.40 7
1979-09-18 Perforation 368.90 369.40 7
1979-09-18 Perforation 370.40 370.90 7
1979-09-22 Fracture 306.50 370.90 0
1994-10-22 Packing Device Capped w/Cement 278.50 286.50 0
1979-09-10 Perforation 430.90 432.00 7
1979-09-10 Perforation 441.00 442.50 7
1979-09-10 Perforation 444.00 444.50 7
1979-09-18 Fracture 427.70 444.50 0
1979-09-18 Perforation 306.50 307.10 7
1979-09-18 Perforation 319.50 320.10 7
1979-09-18 Perforation 341.60 342.20 7
1979-09-18 Perforation 344.00 345.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 7831 0.0 0.0 0.0
1981 8735 0.0 0.0 0.0
1982 3883 0.0 0.0 0.0
1983 6530 0.0 0.0 0.0
1984 8755 0.0 0.0 0.0
1985 8533 0.0 0.0 0.0
1986 7033 0.0 0.0 0.0
1987 7490 0.0 0.0 0.0
1988 8680 0.0 0.0 0.0
1989 7981 0.0 0.0 0.0
1990 8347 0.0 0.0 0.0
1991 7796 0.0 0.0 0.0
1992 8712 0.0 0.0 0.0
1993 8261 0.0 0.0 0.0
1994 6551 0.0 0.0 0.0

For data sources see[5]

References