X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174110916000

Well Details

Well ID: 0174110916000
Loading map...
Location: 00/16-09-017-11W4/0
Location Alias: 00/16-09-17-11 W4M
Location Alias 2: 00/16-09-017-11 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 11
Section: 09
County/Municipality: County of Newell
Well Name: TXNE 16B ALDSON 16-9-17-11
Operator Name: Torxen Energy Ltd.
License Number: 0235658
License Date: 2000-03-25
License Status: Issued
Spud Date: 2000-04-04
Final Drill Date: 2000-04-05
Well Total Depth: 898.00 m
Surface Hole Latitude: 50.425040
Surface Hole Longitude: -111.459860

For data sources see[1][2]

Well History

Date Event
2000-03-25 Obtained License
2000-04-04 Direction Drilling Operation Performed - Deviate
2000-04-05 Finished Drilling
2000-04-05 Production Casing Operation Performed
2000-04-05 Rig Released
2000-04-05 Well Mode changed to Drilled and Cased
2000-04-08 Well Log Performed
2000-04-12 Well Log Performed
2000-05-05 Perforation Treatment Performed - Jet Perforation
2000-05-06 Perforation Treatment Performed - Fractured
2000-05-08 Perforation Treatment Performed - Jet Perforation
2000-05-09 Perforation Treatment Performed - Fractured
2000-05-11 Perforation Treatment Performed - Jet Perforation
2000-05-13 Perforation Treatment Performed - Fractured
2000-05-15 Perforation Treatment Performed - Jet Perforation
2000-05-16 Perforation Treatment Performed - Fractured
2000-06-04 Well Began Production
2000-06-04 Well Fluid changed to Gas
2000-06-04 Well Mode changed to Flowing
2007-01-22 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-04-04 58.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-05-05 Perforation 821.00 823.00 7
2000-05-15 Perforation 383.00 386.00 7
2000-05-15 Perforation 367.00 369.00 7
2000-05-16 Fracture 367.00 386.00 0
2000-05-06 Fracture 821.00 823.00 0
2000-05-08 Perforation 551.00 553.00 7
2000-05-08 Perforation 542.00 544.00 7
2000-05-09 Fracture 542.00 553.00 0
2000-05-11 Perforation 453.00 455.00 7
2000-05-11 Perforation 438.00 440.00 7
2000-05-11 Perforation 415.00 417.00 7
2000-05-13 Fracture 415.00 455.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5125 0.0 0.0 0.0
2001 8685 0.0 0.0 0.0
2002 8214 0.0 0.0 0.0
2003 8346 0.0 0.0 0.0
2004 2115 0.0 0.0 0.0
2005 2453 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8727 0.0 0.0 0.0
2018 8718 0.0 0.0 0.0
2019 8757 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References