X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174102506020

Well Details

Well ID: 0174102506020
Loading map...
Location: 02/06-25-017-10W4/0
Location Alias: 02/06-25-17-10 W4M
Location Alias 2: 02/06-25-017-10 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 25
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 6-25-17-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0391448
License Date: 2008-01-10
License Status: Issued
Spud Date: 2008-02-18
Final Drill Date: 2008-02-20
Well Total Depth: 815.00 m
Surface Hole Latitude: 50.463979
Surface Hole Longitude: -111.257532

For data sources see[1][2]

Well History

Date Event
2008-01-10 Obtained License
2008-02-07 Conductor Casing Operation Performed
2008-02-18 Direction Drilling Operation Performed - Deviate
2008-02-18 Lost Circulation Occurred
2008-02-20 Finished Drilling
2008-02-20 Production Casing Operation Performed
2008-02-20 Rig Released
2008-02-20 Well Mode changed to Drilled and Cased
2008-02-24 Well Log Performed
2008-02-27 Perforation Treatment Performed - Jet Perforation
2008-04-16 Perforation Treatment Performed - Fractured
2008-07-03 Well Began Production
2008-07-03 Well Fluid changed to Gas
2008-07-03 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-02-18 98.20 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-02-27 Perforation 752.00 754.00 7
2008-04-16 Fracture 752.00 754.00 0
2008-04-16 Fracture 562.00 563.00 0
2008-04-16 Fracture 506.00 507.00 0
2008-04-16 Fracture 491.00 492.00 0
2008-04-16 Fracture 482.00 483.00 0
2008-04-16 Fracture 463.00 464.00 0
2008-04-16 Fracture 454.50 455.50 0
2008-04-16 Fracture 445.00 446.00 0
2008-04-16 Fracture 436.00 437.00 0
2008-02-27 Perforation 562.00 563.00 7
2008-02-27 Perforation 506.00 507.00 7
2008-02-27 Perforation 491.00 492.00 7
2008-02-27 Perforation 482.00 483.00 7
2008-02-27 Perforation 463.00 464.00 7
2008-02-27 Perforation 454.50 455.50 7
2008-02-27 Perforation 445.00 446.00 7
2008-02-27 Perforation 436.00 437.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4368 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-02-18 Lost Circulation 61.00 815.00

For data sources see[7]

References