X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174101908000

Well Details

Well ID: 0174101908000
Loading map...
Location: 00/08-19-017-10W4/0
Location Alias: 00/08-19-17-10 W4M
Location Alias 2: 00/08-19-017-10 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 19
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 8-19-17-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0118590
License Date: 1985-10-24
License Status: Issued
Spud Date: 1985-11-04
Final Drill Date: 1985-11-05
Well Total Depth: 690.00 m
Surface Hole Latitude: 50.446759
Surface Hole Longitude: -111.357074

For data sources see[1][2]

Well History

Date Event
1985-10-24 Obtained License
1985-11-04 Surface Casing Operation Performed
1985-11-05 Finished Drilling
1985-11-05 Well Mode changed to Drilled and Cased
1985-11-06 Production Casing Operation Performed
1985-11-06 Rig Released
1985-11-23 Well Log Performed
1986-01-14 Perforation Treatment Performed - Jet Perforation
1986-01-15 Perforation Treatment Performed - Fractured
1986-01-16 Perforation Treatment Performed - Jet Perforation
1986-01-20 Perforation Treatment Performed - Fractured
1986-02-02 Perforation Treatment Performed - Jet Perforation
1986-02-05 Perforation Treatment Performed - Fractured
1986-08-01 Well Began Production
1986-08-01 Well Fluid changed to Gas
1986-08-01 Well Mode changed to Flowing
1991-12-01 Well Fluid changed to Gas
1991-12-01 Well Mode changed to Flowing
2006-03-06 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-14 Perforation 612.50 613.50 13
1986-02-02 Perforation 340.00 341.00 6
1986-02-02 Perforation 349.50 351.00 6
1986-02-02 Perforation 353.50 354.50 6
1986-02-02 Perforation 358.00 359.50 6
1986-02-02 Perforation 366.50 367.50 6
1986-02-05 Fracture 313.50 367.50 0
2006-03-06 Fracture 349.50 354.50 0
2006-03-06 Fracture 334.50 335.50 0
2006-03-06 Fracture 322.50 323.50 0
2006-03-06 Fracture 313.50 315.00 0
1986-01-14 Perforation 615.50 617.00 13
1986-01-15 Fracture 612.50 617.00 0
1986-01-16 Perforation 416.00 417.50 13
1986-01-16 Perforation 422.00 423.50 13
1986-01-20 Fracture 416.00 423.50 0
1986-02-02 Perforation 313.50 315.00 6
1986-02-02 Perforation 322.50 323.50 6
1986-02-02 Perforation 334.50 335.50 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 2618 0.0 0.0 0.0
1987 4867 0.0 0.0 0.0
1988 7332 0.0 0.0 0.0
1989 7689 0.0 0.0 0.0
1990 6686 0.0 0.0 0.0
1991 6069 0.0 0.0 0.0
1992 6374 0.0 0.0 0.0
1993 8081 0.0 0.0 0.0
1994 8755 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8607 0.0 0.0 0.0
2001 8544 0.0 0.0 0.0
2002 8717 0.0 0.0 0.0
2003 8674 0.0 0.0 0.0
2004 8662 0.0 0.0 0.0
2005 8753 0.0 0.0 0.0
2006 8372 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References