If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0174100906002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/06-09-017-10W4/2 | |
| Location Alias: 00/06-09-17-10 W4M | |
| Location Alias 2: 00/06-09-017-10 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 017 | |
| Meridian: 4 | |
| Range: 10 | |
| Section: 09 | |
| County/Municipality: Cypress County | |
| Well Name: PINE CLIFF ALDSON 6-9-17-10 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0054187 | |
| License Date: 1975-07-10 | |
| License Status: Issued | |
| Spud Date: 1975-08-15 | |
| Final Drill Date: 1975-08-16 | |
| Well Total Depth: 658.40 m | |
| Surface Hole Latitude: 50.418686 | |
| Surface Hole Longitude: -111.322548 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1975-07-10 | Obtained License |
| 1975-08-16 | Finished Drilling |
| 1975-08-16 | Well Mode changed to Drilled and Cased |
| 1975-08-17 | Production Casing Operation Performed |
| 1975-08-29 | Perforation Treatment Performed - Jet Perforation |
| 1975-08-30 | Perforation Treatment Performed - Fractured |
| 1975-08-30 | Perforation Treatment Performed - Jet Perforation |
| 1975-09-03 | Perforation Treatment Performed - Fractured |
| 1975-09-04 | Perforation Treatment Performed - Fractured |
| 1975-09-04 | Perforation Treatment Performed - Jet Perforation |
| 1975-12-04 | Well Began Production |
| 1975-12-04 | Well Fluid changed to Gas |
| 1975-12-04 | Well Mode changed to Flowing |
| 1991-12-01 | Well Structure changed to Commingled |
| 2007-02-13 | Perforation Treatment Performed - Jet Perforation |
| 2007-04-01 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1975-08-29 | Perforation | 612.00 | 613.60 | 13 |
| 1975-09-04 | Perforation | 344.10 | 345.30 | 7 |
| 1975-09-04 | Perforation | 354.20 | 355.40 | 7 |
| 1975-09-04 | Perforation | 362.10 | 363.30 | 7 |
| 1975-09-04 | Fracture | 299.30 | 363.30 | 0 |
| 2007-02-13 | Perforation | 331.60 | 332.60 | 7 |
| 2007-04-01 | Fracture | 362.10 | 363.30 | 0 |
| 2007-04-01 | Fracture | 354.20 | 355.40 | 0 |
| 2007-04-01 | Fracture | 344.10 | 345.30 | 0 |
| 2007-04-01 | Fracture | 331.60 | 332.60 | 0 |
| 2007-04-01 | Fracture | 317.30 | 317.90 | 0 |
| 1975-08-29 | Perforation | 621.80 | 623.00 | 7 |
| 1975-08-30 | Fracture | 612.00 | 623.00 | 0 |
| 1975-08-30 | Perforation | 410.90 | 412.70 | 10 |
| 1975-08-30 | Perforation | 417.00 | 418.50 | 10 |
| 1975-09-03 | Fracture | 410.90 | 418.50 | 0 |
| 1975-09-04 | Perforation | 299.30 | 300.20 | 7 |
| 1975-09-04 | Perforation | 307.80 | 309.70 | 7 |
| 1975-09-04 | Perforation | 317.30 | 317.90 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1975 | 666 | 0.0 | 0.0 | 0.0 |
| 1976 | 8673 | 0.0 | 0.0 | 0.0 |
| 1977 | 8646 | 0.0 | 0.0 | 0.0 |
| 1978 | 6186 | 0.0 | 0.0 | 0.0 |
| 1979 | 7830 | 0.0 | 0.0 | 0.0 |
| 1980 | 8359 | 0.0 | 0.0 | 0.0 |
| 1981 | 3965 | 0.0 | 0.0 | 0.0 |
| 1982 | 7111 | 0.0 | 0.0 | 0.0 |
| 1983 | 7414 | 0.0 | 0.0 | 0.0 |
| 1984 | 5120 | 0.0 | 0.0 | 0.0 |
| 1985 | 6180 | 0.0 | 0.0 | 0.0 |
| 1986 | 2324 | 0.0 | 0.0 | 0.0 |
| 1987 | 5741 | 0.0 | 0.0 | 0.0 |
| 1988 | 7325 | 0.0 | 0.0 | 0.0 |
| 1989 | 7100 | 0.0 | 0.0 | 0.0 |
| 1990 | 5529 | 0.0 | 0.0 | 0.0 |
| 1991 | 5419 | 0.0 | 0.0 | 0.0 |
For data sources see[5]