X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174100814000

Well Details

Well ID: 0174100814000
Loading map...
Location: 00/14-08-017-10W4/0
Location Alias: 00/14-08-17-10 W4M
Location Alias 2: 00/14-08-017-10 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 08
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 14-8-17-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0119943
License Date: 1985-12-02
License Status: Issued
Spud Date: 1985-12-08
Final Drill Date: 1985-12-09
Well Total Depth: 680.00 m
Surface Hole Latitude: 50.425928
Surface Hole Longitude: -111.345466

For data sources see[1][2]

Well History

Date Event
1985-12-02 Obtained License
1985-12-08 Surface Casing Operation Performed
1985-12-09 Finished Drilling
1985-12-09 Production Casing Operation Performed
1985-12-09 Rig Released
1985-12-09 Well Mode changed to Drilled and Cased
1985-12-13 Well Log Performed
1985-12-14 Well Log Performed
1986-01-24 Perforation Treatment Performed - Jet Perforation
1986-01-29 Perforation Treatment Performed - Fractured
1986-01-31 Perforation Treatment Performed - Jet Perforation
1986-02-04 Perforation Treatment Performed - Fractured
1986-02-09 Perforation Treatment Performed - Jet Perforation
1986-02-12 Perforation Treatment Performed - Fractured
1986-08-16 Well Began Production
1986-08-16 Well Fluid changed to Gas
1986-08-16 Well Mode changed to Flowing
1991-12-01 Well Fluid changed to Gas
1991-12-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-24 Perforation 611.00 612.00 13
1986-02-09 Perforation 348.50 349.50 6
1986-02-09 Perforation 350.50 351.50 6
1986-02-09 Perforation 353.50 354.50 6
1986-02-09 Perforation 360.00 361.00 6
1986-02-09 Perforation 362.50 363.50 6
1986-02-09 Perforation 366.00 367.50 9
1986-02-09 Perforation 369.00 370.00 6
1986-02-12 Fracture 312.50 370.00 0
1986-01-24 Perforation 619.50 621.50 13
1986-01-29 Fracture 611.00 621.50 0
1986-01-31 Perforation 416.50 417.50 13
1986-01-31 Perforation 422.50 424.00 13
1986-02-04 Fracture 416.50 424.00 0
1986-02-09 Perforation 312.50 314.50 13
1986-02-09 Perforation 329.00 330.00 6
1986-02-09 Perforation 335.50 336.50 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 2234 0.0 0.0 0.0
1987 5021 0.0 0.0 0.0
1988 7282 0.0 0.0 0.0
1989 5802 0.0 0.0 0.0
1990 6101 0.0 0.0 0.0
1991 5424 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8747 0.0 0.0 0.0
1994 8755 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8595 0.0 0.0 0.0
2001 8493 0.0 0.0 0.0
2002 8716 0.0 0.0 0.0
2003 8678 0.0 0.0 0.0
2004 8662 0.0 0.0 0.0
2005 8753 0.0 0.0 0.0
2006 8637 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References