X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174100108000

Well Details

Well ID: 0174100108000
Loading map...
Location: 00/08-01-017-10W4/0
Location Alias: 00/08-01-17-10 W4M
Location Alias 2: 00/08-01-017-10 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 01
County/Municipality: Cypress County
Well Name: OIL 78 ALDERSON 8-1-17-10
Operator Name: Enerplus Corporation
License Number: 0069847
License Date: 1978-06-01
License Status: RecCertified
Spud Date: 1978-07-09
Final Drill Date: 1978-07-10
Well Total Depth: 466.00 m
Surface Hole Latitude: 50.404176
Surface Hole Longitude: -111.242525

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-06-01 Obtained License
1978-07-10 Finished Drilling
1978-07-10 Production Casing Operation Performed
1978-07-10 Well Mode changed to Drilled and Cased
1978-09-04 Perforation Treatment Performed - Jet Perforation
1978-09-11 Perforation Treatment Performed - Fractured
1978-09-20 Perforation Treatment Performed - Jet Perforation
1978-09-21 Perforation Treatment Performed - Fractured
1979-02-10 Well Began Production
1979-02-10 Well Fluid changed to Gas
1979-02-10 Well Mode changed to Flowing
1992-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-19 Perforation Treatment Performed - Jet Perforation
1992-09-19 Plug Back Performed
1992-09-19 Well Fluid changed to Gas
1992-09-19 Well Log Performed
1992-09-19 Well Mode changed to Abandoned
1992-09-22 Perforation Treatment Performed - Jet Perforation
1992-09-22 Well Log Performed
1992-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-23 Plug Back Performed
1992-09-23 Well Abandoned
1992-09-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-09-04 Perforation 421.50 423.00 7
1978-09-20 Perforation 366.00 366.50 7
1978-09-20 Perforation 372.00 372.50 7
1978-09-20 Perforation 374.50 375.00 7
1978-09-21 Fracture 317.00 375.00 0
1992-09-19 Packing Device Capped w/Cement 299.00 307.00 0
1992-09-19 Perforation 180.00 183.00 13
1992-09-22 Perforation 179.50 186.00 13
1992-09-23 Packing Device Capped w/Cement 167.00 175.00 0
1978-09-04 Perforation 428.30 429.80 7
1978-09-11 Fracture 421.50 429.80 0
1978-09-20 Perforation 317.00 318.00 6
1978-09-20 Perforation 338.50 339.00 7
1978-09-20 Perforation 343.20 343.70 7
1978-09-20 Perforation 353.40 353.90 7
1978-09-20 Perforation 355.70 356.20 7
1978-09-20 Perforation 359.40 360.40 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 6374 0.0 0.0 0.0
1980 7412 0.0 0.0 0.0
1981 1416 0.0 0.0 0.0
1982 4793 0.0 0.0 0.0
1983 5498 0.0 0.0 0.0
1984 3962 0.0 0.0 0.0
1985 6089 0.0 0.0 0.0
1986 2402 0.0 0.0 0.0
1987 7177 0.0 0.0 0.0
1988 7109 0.0 0.0 0.0
1989 6847 0.0 0.0 0.0
1990 6681 0.0 0.0 0.0
1991 6084 0.0 0.0 0.0
1992 3602 0.0 0.0 0.0

For data sources see[5]

References