X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164270410000

Well Details

Well ID: 0164270410000
Loading map...
Location: 00/10-04-016-27W4/0
Location Alias: 00/10-04-16-27 W4M
Location Alias 2: 00/10-04-016-27 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 27
Section: 04
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: COMPTON CONNEMARA 10-4-16-27
Operator Name: Lexin Resources Ltd.
License Number: 0233618
License Date: 2000-02-12
License Status: Suspension
Spud Date: 2000-02-21
Final Drill Date: 2000-03-09
Well Total Depth: 2350.00 m
Surface Hole Latitude: 50.320299
Surface Hole Longitude: -113.654980

For data sources see[1][2]

Well History

Date Event
2000-02-12 Obtained License
2000-02-23 Surface Casing Operation Performed
2000-03-09 Finished Drilling
2000-03-09 Well Log Performed
2000-03-10 Well Log Performed
2000-03-11 Drill Stem Test Performed
2000-03-13 Drill Stem Test Performed
2000-03-14 Production Casing Operation Performed
2000-03-14 Rig Released
2000-03-14 Well Mode changed to Drilled and Cased
2000-03-20 Well Log Performed
2000-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-21 Perforation Treatment Performed - Jet Perforation
2000-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-28 Perforation Treatment Performed - Jet Perforation
2000-03-28 Well Log Performed
2000-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-29 Well Began Production
2000-03-29 Well Fluid changed to Crude Oil
2000-03-29 Well Mode changed to Pumping
2000-06-16 Well Fluid changed to Crude Oil
2000-06-16 Well Mode changed to Pumping
2006-01-31 Well Fluid changed to Crude Oil
2006-01-31 Well Mode changed to Suspended
2019-07-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-01 Perforation Treatment Performed - Jet Perforation
2019-07-01 Plug Back Performed
2019-07-01 Well Fluid changed to Crude Oil
2019-07-01 Well Log Performed
2019-07-01 Well Mode changed to Abandoned Zone
2019-07-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-02 Perforation Treatment Performed - Cement Squeeze
2019-07-02 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-21 Perforation 2289.00 2291.00 13
2019-07-01 Perforation 605.00 606.00 17
2019-07-02 Cement Squeeze 605.00 606.00 0
2019-07-02 Packing Device Capped w/Cement 591.00 601.00 0
2000-03-21 Perforation 2294.00 2297.00 13
2000-03-21 Perforation 2298.00 2299.00 13
2000-03-21 Acid Treatment 2289.00 2299.00 0
2000-03-22 Acid Treatment 2289.00 2299.00 0
2000-03-25 Acid Treatment 2289.00 2299.00 0
2000-03-28 Perforation 2301.00 2303.50 17
2000-03-29 Acid Treatment 2301.00 2303.50 0
2019-07-01 Packing Device Capped w/Cement 2274.00 2282.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 4172 0.0 0.0 0.0
2001 7469 0.0 0.0 0.0
2002 6834 0.0 0.0 0.0
2003 7339 0.0 0.0 0.0
2004 1583 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-02 No Incident Encountered 0.00 0.00

For data sources see[6]

References