X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164270406000

Well Details

Well ID: 0164270406000
Loading map...
Location: 00/06-04-016-27W4/0
Location Alias: 00/06-04-16-27 W4M
Location Alias 2: 00/06-04-016-27 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 27
Section: 04
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: COMPTON COMARA 6-4-16-27
Operator Name: Lexin Resources Ltd.
License Number: 0010331
License Date: 1955-10-18
License Status: Issued
Spud Date: 1955-10-22
Final Drill Date: 1956-01-22
Well Total Depth: 2743.50 m
Surface Hole Latitude: 50.315427
Surface Hole Longitude: -113.658681

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-10-18 Obtained License
1955-11-06 Drill Stem Test Performed
1955-11-28 Drill Stem Test Performed
1955-12-06 Drill Stem Test Performed
1955-12-12 Drill Stem Test Performed
1955-12-13 Drill Stem Test Performed
1955-12-15 Drill Stem Test Performed
1955-12-21 Drill Stem Test Performed
1955-12-25 Drill Stem Test Performed
1955-12-27 Drill Stem Test Performed
1955-12-29 Drill Stem Test Performed
1956-01-20 Drill Stem Test Performed
1956-01-22 Finished Drilling
1956-01-29 Production Casing Operation Performed
1956-02-03 Perforation Treatment Performed - Abrasa-Jet Perforation
1956-02-04 Perforation Treatment Performed - Cement Squeeze
1956-02-06 Perforation Treatment Performed - Bullet Perforation
1956-02-06 Perforation Treatment Performed - Cement Squeeze
1956-02-07 Perforation Treatment Performed - Bullet Perforation
1956-02-08 Perforation Treatment Performed - Cement Squeeze
1956-02-09 Perforation Treatment Performed - Bullet Perforation
1956-02-15 Perforation Treatment Performed - Acid Wash - No Pressure
1956-02-23 Perforation Treatment Performed - Cement Squeeze
1956-02-26 Perforation Treatment Performed - Bullet Perforation
1956-02-27 Perforation Treatment Performed - Acid Wash - No Pressure
1956-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-03-03 Perforation Treatment Performed - Cement Squeeze
1956-03-04 Perforation Treatment Performed - Bullet Perforation
1956-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-05-30 Well Mode changed to Drilled and Cased
1992-01-07 Well Began Production
1992-01-07 Well Fluid changed to Gas
1992-01-07 Well Mode changed to Flowing
1992-01-28 Well Fluid changed to Gas
1992-01-28 Well Mode changed to Suspended
1993-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-08 Perforation Treatment Performed - Cement Squeeze
1993-10-14 Well Log Performed
1993-10-15 Perforation Treatment Performed - Jet Perforation
1993-10-20 Well Log Performed
1993-10-21 Perforation Treatment Performed - Jet Perforation
1993-12-09 Well Fluid changed to Crude Oil
1993-12-09 Well Mode changed to Pumping
1994-01-01 Well Fluid changed to Crude Oil
1994-01-01 Well Mode changed to Suspended
1996-07-04 Perforation Treatment Performed - Jet Perforation
1996-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-08 Perforation Treatment Performed - Jet Perforation
1996-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-01 Well Fluid changed to Crude Oil
1996-08-01 Well Mode changed to Pumping
1996-08-31 Well Fluid changed to Crude Oil
1996-08-31 Well Mode changed to Suspended
1997-01-09 Well Fluid changed to Crude Oil
1997-01-09 Well Mode changed to Suspended
1997-01-13 Perforation Treatment Performed - Cement Squeeze
1997-01-13 Plug Back Performed
1997-01-26 Perforation Treatment Performed - Cement Squeeze
1997-08-02 Perforation Treatment Performed - Fractured
1997-08-02 Perforation Treatment Performed - Jet Perforation
1997-08-11 Perforation Treatment Performed - Jet Perforation
1997-08-18 Perforation Treatment Performed - Fractured
1997-08-23 Well Fluid changed to Crude Oil
1997-08-23 Well Mode changed to Suspended
1997-12-12 Well Fluid changed to Gas
1997-12-12 Well Mode changed to Flowing
1998-09-26 Perforation Treatment Performed - Jet Perforation
1999-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-01 Well Fluid changed to Crude Oil
2000-01-01 Well Mode changed to Flowing
2001-03-10 Perforation Treatment Performed - Cement Squeeze
2002-02-04 Perforation Treatment Performed - Cement Plug
2002-02-04 Plug Back Performed
2006-01-31 Well Fluid changed to Crude Oil
2006-01-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-02-03 Hydra Jet Perforation 2302.80 2302.80 0
1956-02-26 Bullet Perforation 2296.70 2298.20 13
1956-02-27 Acid Wash 2296.70 2298.20 0
1956-02-28 Acid Treatment 2296.70 2298.20 0
1956-03-03 Cement Squeeze 2296.70 2298.20 0
1956-03-04 Bullet Perforation 2283.00 2290.60 13
1956-03-05 Acid Treatment 2283.00 2290.60 0
1993-10-08 Acid Treatment 2283.00 2290.60 0
1993-10-08 Cement Squeeze 2283.00 2290.60 0
1993-10-15 Perforation 2318.30 2322.30 18
1993-10-21 Perforation 2302.50 2307.90 18
1956-02-04 Cement Squeeze 2302.80 2302.80 0
1996-07-04 Perforation 2297.30 2299.10 13
1996-07-05 Acid Treatment 2297.30 2299.10 0
1996-07-08 Perforation 2298.20 2300.90 13
1996-07-09 Acid Treatment 2297.30 2300.90 0
1997-01-13 Cement Squeeze 2297.30 2300.90 0
1997-01-26 Cement Squeeze 2302.50 2322.30 0
1997-08-02 Perforation 2280.30 2290.60 13
1997-08-02 Perforation 2297.10 2301.80 13
1997-08-02 Fracture 2280.30 2301.80 0
1997-08-11 Perforation 2210.50 2221.50 13
1956-02-06 Bullet Perforation 2300.90 2301.20 13
1997-08-18 Fracture 2210.50 2221.50 0
1998-09-26 Perforation 2315.90 2318.30 13
1998-09-26 Perforation 2290.20 2296.40 13
1999-01-21 Acid Treatment 2290.20 2318.30 0
2001-03-10 Cement Squeeze 2315.90 2318.00 0
2002-02-04 Cement Plug 2296.50 2301.50 0
1956-02-06 Cement Squeeze 2300.90 2301.20 0
1956-02-07 Bullet Perforation 2301.20 2301.50 13
1956-02-08 Cement Squeeze 2301.20 2301.50 0
1956-02-09 Bullet Perforation 2297.30 2299.10 13
1956-02-15 Acid Wash 2297.30 2299.10 0
1956-02-23 Cement Squeeze 2297.30 2299.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 78 0.0 0.0 0.0
1993 146 0.0 0.0 0.0
1996 163 0.0 0.0 0.0
1997 625 0.0 0.0 0.0
1998 8431 0.0 0.0 0.0
1999 5406 0.0 0.0 0.0
2000 3274 0.0 0.0 0.0
2001 22 0.0 0.0 0.0

For data sources see[5]

References