X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164241616000

Well Details

Well ID: 0164241616000
Loading map...
Location: 00/16-16-016-24W4/0
Location Alias: 00/16-16-16-24 W4M
Location Alias 2: 00/16-16-016-24 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 24
Section: 16
County/Municipality: Vulcan County
Well Name: AMOCO VULCAN 16-16-16-24
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0052247
License Date: 1974-12-17
License Status: RecCertified
Spud Date: 1974-12-17
Final Drill Date: 1975-01-13
Well Total Depth: 1850.70 m
Surface Hole Latitude: 50.352796
Surface Hole Longitude: -113.236101

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-12-17 Obtained License
1975-01-12 Drill Stem Test Performed
1975-01-13 Finished Drilling
1975-01-13 Well Mode changed to Drilled and Cased
1975-01-15 Drill Stem Test Performed
1975-01-17 Production Casing Operation Performed
1975-02-26 Perforation Treatment Performed - Acid Wash - No Pressure
1975-02-26 Perforation Treatment Performed - Jet Perforation
1975-08-07 Well Began Production
1975-08-07 Well Fluid changed to Gas
1975-08-07 Well Mode changed to Flowing
1981-07-01 Well Fluid changed to Gas
1981-07-01 Well Mode changed to Suspended
1991-11-01 Well Fluid changed to Gas
1991-11-01 Well Mode changed to Flowing
1993-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-25 Perforation Treatment Performed - Jet Perforation
1993-03-25 Perforation Treatment Performed - Remedial Casing
1993-03-25 Plug Back Performed
1993-03-25 Well Fluid changed to Gas
1993-03-25 Well Mode changed to Abandoned
1993-03-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-02-26 Perforation 1816.30 1818.70 7
1975-02-26 Perforation 1819.70 1822.40 7
1975-02-26 Acid Wash 1816.30 1822.40 0
1993-03-25 Packing Device Capped w/Cement 1782.00 1790.00 0
1993-03-25 Perforation 263.00 263.50 13
1993-03-25 Perforation 263.00 263.50 13
1993-03-25 Remedial Casing Cementing 263.00 263.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 1896 0.0 0.0 0.0
1976 2150 0.0 0.0 0.0
1977 4675 0.0 0.0 0.0
1978 5345 0.0 0.0 0.0
1979 8618 0.0 0.0 0.0
1980 8490 0.0 0.0 0.0
1981 4049 0.0 0.0 0.0
1991 1320 0.0 0.0 0.0
1992 744 0.0 0.0 0.0

For data sources see[5]

References