X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164223506000

Well Details

Well ID: 0164223506000
Loading map...
Location: 00/06-35-016-22W4/0
Location Alias: 00/06-35-16-22 W4M
Location Alias 2: 00/06-35-016-22 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 22
Section: 35
County/Municipality: Vulcan County
Well Name: AMOCO LONGCO 6-35-16-22
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0051589
License Date: 1974-10-23
License Status: Re-Entered
Spud Date: 1974-10-23
Final Drill Date: 1974-10-30
Well Total Depth: 1548.40 m
Surface Hole Latitude: 50.389636
Surface Hole Longitude: -112.930313

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-10-23 Obtained License
1974-10-30 Finished Drilling
1974-10-30 Well Mode changed to Drilled and Cased
1974-10-31 Drill Stem Test Performed
1974-11-01 Drill Stem Test Performed
1974-11-02 Production Casing Operation Performed
1974-12-04 Perforation Treatment Performed - Jet Perforation
1974-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-12-06 Well Began Production
1974-12-06 Well Fluid changed to Crude Oil
1974-12-06 Well Mode changed to Flowing
1975-01-05 Perforation Treatment Performed - Jet Perforation
1975-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-01 Well Fluid changed to Crude Oil
1975-06-01 Well Mode changed to Suspended
1977-06-06 Well Fluid changed to Crude Oil
1977-06-06 Well Mode changed to Flowing
1987-03-01 Well Fluid changed to Crude Oil
1987-03-01 Well Mode changed to Suspended
1993-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-11 Perforation Treatment Performed - Jet Perforation
1993-03-11 Plug Back Performed
1993-03-11 Well Fluid changed to Crude Oil
1993-03-11 Well Log Performed
1993-03-11 Well Mode changed to Abandoned and Re-entered
1993-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-13 Plug Back Performed
1993-03-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-12-04 Perforation 1452.40 1453.90 7
1974-12-05 Acid Treatment 1452.40 1453.90 0
1975-01-05 Perforation 1449.30 1450.80 7
1975-01-06 Acid Treatment 1449.30 1450.80 0
1993-03-11 Packing Device Capped w/Cement 1443.00 1446.00 0
1993-03-11 Perforation 1438.00 1439.50 13
1993-03-13 Packing Device Capped w/Cement 1425.00 1433.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 164 0.0 0.0 0.0
1975 772 0.0 0.0 0.0
1977 3033 0.0 0.0 0.0
1978 3103 0.0 0.0 0.0
1979 3665 0.0 0.0 0.0
1980 2989 0.0 0.0 0.0
1981 268 0.0 0.0 0.0
1982 3018 0.0 0.0 0.0
1983 6341 0.0 0.0 0.0
1984 5865 0.0 0.0 0.0
1985 3163 0.0 0.0 0.0
1986 3356 0.0 0.0 0.0
1987 0 0.0 0.0 0.0

For data sources see[5]

References