X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164193213000

Well Details

Well ID: 0164193213000
Loading map...
Location: 00/13-32-016-19W4/0
Location Alias: 00/13-32-16-19 W4M
Location Alias 2: 00/13-32-016-19 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 19
Section: 32
County/Municipality: Vulcan County
Well Name: HUNT SHAPCO ARMADA 13-32-16-19
Operator Name: HOC Energy Corp.
License Number: 0126311
License Date: 1987-04-21
License Status: RecCertified
Spud Date: 1987-04-28
Final Drill Date: 1987-05-03
Well Total Depth: 1275.00 m
Surface Hole Latitude: 50.393861
Surface Hole Longitude: -112.588683

For data sources see[1][2]

Well History

Date Event
1987-04-21 Obtained License
1987-04-29 Surface Casing Operation Performed
1987-05-03 Drill Stem Test Performed
1987-05-03 Finished Drilling
1987-05-03 Well Log Performed
1987-05-04 Drill Stem Test Performed
1987-05-05 Drill Stem Test Performed
1987-05-06 Production Casing Operation Performed
1987-05-06 Rig Released
1987-07-17 Well Log Performed
1987-07-18 Perforation Treatment Performed - Jet Perforation
1987-07-19 Perforation Treatment Performed - Jet Perforation
1987-07-19 Well Log Performed
1987-09-09 Well Mode changed to Drilled and Cased
1988-01-10 Well Began Production
1988-01-10 Well Fluid changed to Gas
1988-01-10 Well Mode changed to Flowing
1988-03-05 Well Fluid changed to Gas
1988-03-05 Well Mode changed to Suspended
1992-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-02 Plug Back Performed
1992-09-02 Well Fluid changed to Gas
1992-09-02 Well Mode changed to Abandoned Zone
1992-09-03 Well Log Performed
1992-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-07 Perforation Treatment Performed - Jet Perforation
1992-09-07 Well Log Performed
1992-09-08 Perforation Treatment Performed - Remedial Casing
1992-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-07-18 Perforation 1010.00 1011.00 13
1992-09-27 Packing Device Capped w/Cement 305.00 315.00 0
1987-07-19 Perforation 989.50 990.50 13
1992-09-02 Packing Device Capped w/Cement 992.00 1000.00 0
1992-09-02 Packing Device Capped w/Cement 973.00 981.00 0
1992-09-07 Perforation 322.00 323.20 13
1992-09-07 Perforation 439.00 440.80 13
1992-09-07 Acid Treatment 439.00 440.80 0
1992-09-08 Remedial Casing Cementing 439.00 440.80 0
1992-09-09 Acid Treatment 322.00 323.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1834 0.0 0.0 0.0

For data sources see[5]

References