X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164182409020

Well Details

Well ID: 0164182409020
Loading map...
Location: 02/09-24-016-18W4/0
Location Alias: 02/09-24-16-18 W4M
Location Alias 2: 02/09-24-016-18 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 18
Section: 24
County/Municipality: Vulcan County
Well Name: HARVEST 102 9B BADGER 9-24-16-18
Operator Name: Razor Energy Corp.
License Number: 0156521
License Date: 1993-02-16
License Status: Issued
Spud Date: 1993-03-12
Final Drill Date: 1993-03-20
Well Total Depth: 1320.00 m
Surface Hole Latitude: 50.365875
Surface Hole Longitude: -112.343537

For data sources see[1][2]

Well History

Date Event
1993-02-16 Obtained License
1993-03-13 Surface Casing Operation Performed
1993-03-14 Direction Drilling Operation Performed - Deviate
1993-03-20 Finished Drilling
1993-03-20 Well Mode changed to Drilled and Cased
1993-03-21 Well Log Performed
1993-03-22 Production Casing Operation Performed
1993-03-22 Rig Released
1993-03-26 Well Log Performed
1993-04-01 Well Log Performed
1993-04-02 Perforation Treatment Performed - Jet Perforation
1993-04-07 Well Log Performed
1993-05-11 Well Began Production
1993-05-11 Well Fluid changed to Crude Oil
1993-05-11 Well Mode changed to Pumping
1994-04-27 Well Log Performed
1994-04-28 Perforation Treatment Performed - Jet Perforation
1994-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-29 Perforation Treatment Performed - Jet Perforation
1994-04-29 Well Log Performed
1994-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-30 Perforation Treatment Performed - Cement Squeeze
1994-05-06 Perforation Treatment Performed - Jet Perforation
1994-05-06 Well Log Performed
1994-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-10 Perforation Treatment Performed - Cement Squeeze
1994-06-01 Well Log Performed
1994-06-03 Perforation Treatment Performed - Jet Perforation
1994-06-03 Well Log Performed
2010-03-22 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-03-14 210.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-04-02 Perforation 1200.50 1204.50 13
1994-06-03 Perforation 1204.00 1206.00 13
2010-03-22 Perforation 1192.50 1194.00 17
1994-04-28 Perforation 1196.00 1196.30 36
1994-04-29 Acid Treatment 1196.00 1204.50 0
1994-04-29 Perforation 1196.00 1196.30 20
1994-04-30 Acid Treatment 1196.00 1204.50 0
1994-04-30 Cement Squeeze 1196.00 1204.50 0
1994-05-06 Perforation 1196.00 1196.30 20
1994-05-09 Acid Treatment 1196.00 1196.30 0
1994-05-10 Cement Squeeze 1196.00 1196.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5060 0.0 0.0 0.0
1994 7090 0.0 0.0 0.0
1995 6929 0.0 0.0 0.0
1996 4847 0.0 0.0 0.0
1997 1223 0.0 0.0 0.0
1999 41 0.0 0.0 0.0
2000 8134 0.0 0.0 0.0
2001 8149 0.0 0.0 0.0
2002 8618 0.0 0.0 0.0
2003 8526 0.0 0.0 0.0
2004 8555 0.0 0.0 0.0
2005 8329 0.0 0.0 0.0
2006 7792 0.0 0.0 0.0
2007 8726 0.0 0.0 0.0
2008 8743 0.0 0.0 0.0
2009 8617 0.0 0.0 0.0
2010 7130 0.0 0.0 0.0
2011 6168 0.0 0.0 0.0
2012 8728 0.0 0.0 0.0
2013 8613 0.0 0.0 0.0
2014 8476 0.0 0.0 0.0
2015 8563 0.0 0.0 0.0
2016 8726 0.0 0.0 0.0
2017 8367 0.0 0.0 0.0
2018 8554 0.0 0.0 0.0
2019 7685 0.0 0.0 0.0
2020 2155 0.0 0.0 0.0

For data sources see[6]

References