X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164182406000

Well Details

Well ID: 0164182406000
Loading map...
Location: 00/06-24-016-18W4/0
Location Alias: 00/06-24-16-18 W4M
Location Alias 2: 00/06-24-016-18 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 18
Section: 24
County/Municipality: Vulcan County
Well Name: HARVEST BADGER 6-24-16-18
Operator Name: Razor Energy Corp.
License Number: 0094810
License Date: 1982-01-28
License Status: Suspension
Spud Date: 1982-03-05
Final Drill Date: 1982-03-11
Well Total Depth: 1191.00 m
Surface Hole Latitude: 50.360629
Surface Hole Longitude: -112.353534

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-01-28 Obtained License
1982-03-11 Finished Drilling
1982-03-11 Well Mode changed to Drilled and Cased
1982-03-12 Drill Stem Test Performed
1982-03-14 Production Casing Operation Performed
1982-06-03 Perforation Treatment Performed - Jet Perforation
1982-08-01 Well Began Production
1982-08-01 Well Fluid changed to Crude Oil
1982-08-01 Well Mode changed to Flowing
1983-07-27 Perforation Treatment Performed - Jet Perforation
1984-01-18 Well Fluid changed to Crude Oil
1984-01-18 Well Mode changed to Pumping
1997-04-25 Perforation Treatment Performed - Jet Perforation
1997-04-25 Well Log Performed
2004-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-11 Plug Back Performed
2004-02-11 Well Fluid changed to Crude Oil
2004-02-11 Well Log Performed
2004-02-11 Well Mode changed to Abandoned Zone
2004-02-13 Well Log Performed
2004-02-19 Well Log Performed
2004-02-25 Perforation Treatment Performed - Jet Perforation
2004-02-29 Perforation Treatment Performed - Fractured
2004-03-01 Perforation Treatment Performed - Fractured
2015-04-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-29 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-06-03 Perforation 1112.80 1113.80 13
2004-02-25 Perforation 413.00 415.00 7
2004-02-29 Fracture 774.00 777.00 0
2004-02-29 Fracture 536.00 538.00 0
2004-02-29 Fracture 522.00 524.00 0
2004-02-29 Fracture 473.00 475.00 0
2004-03-01 Fracture 413.00 463.00 0
2015-04-28 Packing Device Capped w/Cement 762.00 770.00 0
2015-04-28 Packing Device Capped w/Cement 509.00 517.00 0
2015-04-29 Packing Device Capped w/Cement 464.00 472.00 0
2015-04-29 Packing Device Capped w/Cement 442.00 450.00 0
1983-07-27 Perforation 1111.80 1112.80 13
2015-04-29 Packing Device Capped w/Cement 399.00 407.00 0
1997-04-25 Perforation 1112.00 1114.00 17
2004-02-11 Packing Device Capped w/Cement 1097.00 1105.00 0
2004-02-25 Perforation 774.00 777.00 7
2004-02-25 Perforation 536.00 538.00 7
2004-02-25 Perforation 522.00 524.00 7
2004-02-25 Perforation 473.00 475.00 7
2004-02-25 Perforation 460.00 463.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2664 0.0 0.0 0.0
1983 6665 0.0 0.0 0.0
1984 6638 0.0 0.0 0.0
1985 8204 0.0 0.0 0.0
1986 7805 0.0 0.0 0.0
1987 8604 0.0 0.0 0.0
1988 7532 0.0 0.0 0.0
1989 3976 0.0 0.0 0.0
1990 6674 0.0 0.0 0.0
1991 3705 0.0 0.0 0.0
1992 8264 0.0 0.0 0.0
1993 8410 0.0 0.0 0.0
1994 8086 0.0 0.0 0.0
1995 8366 0.0 0.0 0.0
1996 8148 0.0 0.0 0.0
1997 5309 0.0 0.0 0.0
1998 7212 0.0 0.0 0.0
1999 8598 0.0 0.0 0.0
2000 7868 0.0 0.0 0.0
2001 4658 0.0 0.0 0.0
2002 72 0.0 0.0 0.0
2003 432 0.0 0.0 0.0
2004 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-04-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References