X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164161005000

Well Details

Well ID: 0164161005000
Loading map...
Location: 00/05-10-016-16W4/0
Location Alias: 00/05-10-16-16 W4M
Location Alias 2: 00/05-10-016-16 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 16
Section: 10
County/Municipality: County of Newell
Well Name: TXNE ENCHANT 5-10-16-16
Operator Name: Torxen Energy Ltd.
License Number: 0267703
License Date: 2002-02-14
License Status: Issued
Spud Date: 2002-02-27
Final Drill Date: 2002-02-28
Well Total Depth: 949.00 m
Surface Hole Latitude: 50.331253
Surface Hole Longitude: -112.124701

For data sources see[1][2]

Well History

Date Event
2002-02-14 Obtained License
2002-02-21 Conductor Casing Operation Performed
2002-02-27 Direction Drilling Operation Performed - Deviate
2002-02-28 Finished Drilling
2002-02-28 Production Casing Operation Performed
2002-02-28 Rig Released
2002-02-28 Well Mode changed to Drilled and Cased
2002-03-05 Well Log Performed
2002-04-22 Perforation Treatment Performed - Jet Perforation
2002-04-23 Perforation Treatment Performed - Fractured
2002-05-10 Well Began Production
2002-05-10 Well Fluid changed to Gas
2002-05-10 Well Mode changed to Flowing
2005-11-24 Perforation Treatment Performed - Jet Perforation
2006-01-31 Perforation Treatment Performed - Fractured
2006-02-01 Perforation Treatment Performed - Fractured
2006-02-09 Well Fluid changed to Gas
2006-02-09 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-02-27 73.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-04-22 Perforation 870.50 873.50 7
2005-11-24 Perforation 738.00 739.00 7
2005-11-24 Perforation 722.00 723.00 7
2005-11-24 Perforation 706.00 707.00 7
2005-11-24 Perforation 681.00 682.00 7
2005-11-24 Perforation 663.00 664.00 7
2005-11-24 Perforation 645.00 646.00 7
2005-11-24 Perforation 631.00 632.00 7
2005-11-24 Perforation 614.00 615.00 7
2005-11-24 Perforation 586.00 587.00 7
2005-11-24 Perforation 574.00 575.00 7
2002-04-23 Fracture 870.50 873.50 0
2005-11-24 Perforation 563.00 564.00 7
2005-11-24 Perforation 553.00 554.00 7
2005-11-24 Perforation 539.00 540.00 7
2005-11-24 Perforation 523.00 524.00 7
2005-11-24 Perforation 503.00 504.00 7
2005-11-24 Perforation 489.00 490.00 7
2005-11-24 Perforation 476.00 477.00 7
2005-11-24 Perforation 456.00 457.00 7
2005-11-24 Perforation 437.00 438.00 7
2005-11-24 Perforation 426.00 427.00 7
2005-11-24 Perforation 856.00 857.00 7
2005-11-24 Perforation 412.00 413.00 7
2005-11-24 Perforation 401.00 402.00 7
2005-11-24 Perforation 391.00 392.00 7
2005-11-24 Perforation 379.00 380.00 7
2005-11-24 Perforation 367.00 368.00 7
2005-11-24 Perforation 354.00 355.00 7
2006-01-31 Fracture 856.00 857.00 0
2006-01-31 Fracture 836.00 837.00 0
2006-01-31 Fracture 812.00 813.00 0
2006-01-31 Fracture 799.00 800.00 0
2005-11-24 Perforation 836.00 837.00 7
2006-01-31 Fracture 783.00 784.00 0
2006-01-31 Fracture 772.00 773.00 0
2006-01-31 Fracture 752.00 753.00 0
2006-01-31 Fracture 738.00 739.00 0
2006-01-31 Fracture 722.00 723.00 0
2006-01-31 Fracture 706.00 707.00 0
2006-01-31 Fracture 681.00 682.00 0
2006-01-31 Fracture 663.00 664.00 0
2006-01-31 Fracture 645.00 646.00 0
2006-01-31 Fracture 631.00 632.00 0
2005-11-24 Perforation 812.00 813.00 7
2006-01-31 Fracture 614.00 615.00 0
2006-01-31 Fracture 586.00 587.00 0
2006-01-31 Fracture 574.00 575.00 0
2006-02-01 Fracture 563.00 564.00 0
2006-02-01 Fracture 553.00 554.00 0
2006-02-01 Fracture 523.00 524.00 0
2006-02-01 Fracture 503.00 504.00 0
2006-02-01 Fracture 489.00 490.00 0
2006-02-01 Fracture 476.00 477.00 0
2006-02-01 Fracture 456.00 457.00 0
2005-11-24 Perforation 799.00 800.00 7
2006-02-01 Fracture 437.00 438.00 0
2006-02-01 Fracture 426.00 427.00 0
2006-02-01 Fracture 412.00 413.00 0
2006-02-01 Fracture 401.00 402.00 0
2006-02-01 Fracture 391.00 392.00 0
2006-02-01 Fracture 379.00 380.00 0
2006-02-01 Fracture 367.00 368.00 0
2006-02-01 Fracture 354.00 355.00 0
2005-11-24 Perforation 783.00 784.00 7
2005-11-24 Perforation 772.00 773.00 7
2005-11-24 Perforation 752.00 753.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 5659 0.0 0.0 0.0
2003 7829 0.0 0.0 0.0
2004 8606 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8039 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8711 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8735 0.0 0.0 0.0
2017 8651 0.0 0.0 0.0
2018 8542 0.0 0.0 0.0
2019 5831 0.0 0.0 0.0

For data sources see[6]

References