X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164160111002

Well Details

Well ID: 0164160111002
Loading map...
Location: 00/11-01-016-16W4/2
Location Alias: 00/11-01-16-16 W4M
Location Alias 2: 00/11-01-016-16 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 16
Section: 01
County/Municipality: County of Newell
Well Name: TXNE 14B ENCHANT 11-1-16-16
Operator Name: Torxen Energy Ltd.
License Number: 0181536
License Date: 1995-10-19
License Status: Amended
Spud Date: 1995-11-13
Final Drill Date: 1995-11-22
Well Total Depth: 1546.00 m
Surface Hole Latitude: 50.324029
Surface Hole Longitude: -112.068877

For data sources see[1][2]

Well History

Date Event
1995-10-19 Obtained License
1995-11-13 Direction Drilling Operation Performed - Deviate
1995-11-14 Surface Casing Operation Performed
1995-11-22 Finished Drilling
1995-11-22 Well Log Performed
1995-11-22 Well Mode changed to Drilled and Cased
1995-11-23 Well Log Performed
1995-11-24 Production Casing Operation Performed
1995-11-24 Rig Released
1995-11-24 Well Log Performed
1996-02-03 Well Log Performed
1996-02-08 Well Log Performed
1996-02-09 Perforation Treatment Performed - Jet Perforation
1996-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-10 Plug Back Performed
1996-02-11 Well Log Performed
1996-02-12 Perforation Treatment Performed - Jet Perforation
1996-03-13 Well Log Performed
1996-03-14 Perforation Treatment Performed - Jet Perforation
1996-03-20 Well Log Performed
1996-03-21 Perforation Treatment Performed - Casing Patch (Over Perfs)
1996-03-26 Well Log Performed
1996-03-27 Perforation Treatment Performed - Jet Perforation
2007-02-26 Well Log Performed
2007-03-02 Perforation Treatment Performed - Jet Perforation
2007-03-28 Well Began Production
2007-03-28 Well Fluid changed to Gas
2007-03-28 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-11-13 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-09 Perforation 1504.00 1512.00 20
1996-02-09 Perforation 1518.00 1527.00 20
1996-02-10 Packing Device Capped w/Cement 1499.50 1502.50 0
1996-02-12 Perforation 1479.00 1487.00 20
1996-03-14 Perforation 1468.50 1470.00 30
1996-03-21 Casing Patch 1468.50 1470.00 0
1996-03-27 Perforation 1479.00 1483.00 17
2007-03-02 Perforation 1466.00 1467.00 17
2007-03-02 Perforation 1459.00 1461.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 5095 0.0 0.0 0.0
2008 6923 0.0 0.0 0.0
2009 7010 0.0 0.0 0.0
2010 7740 0.0 0.0 0.0
2011 6668 0.0 0.0 0.0
2012 5543 0.0 0.0 0.0
2013 1064 0.0 0.0 0.0
2014 152 0.0 0.0 0.0
2015 299 0.0 0.0 0.0
2016 8 0.0 0.0 0.0
2017 2616 0.0 0.0 0.0
2018 3123 0.0 0.0 0.0
2019 1504 0.0 0.0 0.0

For data sources see[6]

References