X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164151102002

Well Details

Well ID: 0164151102002
Loading map...
Location: 00/02-11-016-15W4/2
Location Alias: 00/02-11-16-15 W4M
Location Alias 2: 00/02-11-016-15 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 15
Section: 11
County/Municipality: County of Newell
Well Name: TXNE ALDSON 2-11-16-15
Operator Name: Torxen Energy Ltd.
License Number: 0078381
License Date: 1979-10-01
License Status: Suspension
Spud Date: 1979-11-03
Final Drill Date: 1979-11-07
Well Total Depth: 1083.00 m
Surface Hole Latitude: 50.327724
Surface Hole Longitude: -111.962666

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-01 Obtained License
1979-11-07 Finished Drilling
1979-11-07 Well Mode changed to Drilled and Cased
1979-11-08 Drill Stem Test Performed
1979-11-08 Well Log Performed
1979-11-09 Drill Stem Test Performed
1979-11-10 Drill Stem Test Performed
1979-11-11 Production Casing Operation Performed
1980-01-14 Well Log Performed
1980-01-15 Perforation Treatment Performed - Jet Perforation
1980-01-18 Perforation Treatment Performed - Fractured
1997-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-02 Perforation Treatment Performed - Jet Perforation
1997-11-02 Well Mode changed to Drilled and Cased
1999-10-12 Well Began Production
1999-10-12 Well Fluid changed to Gas
1999-10-12 Well Mode changed to Flowing
2000-02-01 Well Fluid changed to Gas
2000-02-01 Well Mode changed to Suspended
2005-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-12 Plug Back Performed
2005-10-12 Well Fluid changed to Gas
2005-10-12 Well Log Performed
2005-10-12 Well Mode changed to Abandoned Zone
2005-11-01 Perforation Treatment Performed - Jet Perforation
2005-11-01 Well Log Performed
2005-11-07 Perforation Treatment Performed - Fractured
2018-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-09-16 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-01-15 Perforation 1019.50 1021.50 13
2018-09-16 Packing Device Capped w/Cement 652.00 660.00 0
1980-01-15 Perforation 1022.50 1023.50 13
1980-01-15 Perforation 1024.50 1025.50 13
1980-01-18 Fracture 1019.50 1025.50 0
1997-11-01 Packing Device Capped w/Cement 892.00 900.00 0
1997-11-02 Perforation 831.50 832.50 16
2005-10-12 Packing Device Capped w/Cement 813.50 821.50 0
2005-11-01 Perforation 668.00 670.00 7
2005-11-07 Fracture 668.00 670.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 863 0.0 0.0 0.0
2000 48 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References