X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164151101000

Well Details

Well ID: 0164151101000
Loading map...
Location: 00/01-11-016-15W4/0
Location Alias: 00/01-11-16-15 W4M
Location Alias 2: 00/01-11-016-15 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 15
Section: 11
County/Municipality: County of Newell
Well Name: TXNE ALDSON 1-11-16-15
Operator Name: Torxen Energy Ltd.
License Number: 0091075
License Date: 1981-07-07
License Status: Abandoned
Spud Date: 1981-08-14
Final Drill Date: 1981-08-19
Well Total Depth: 1080.00 m
Surface Hole Latitude: 50.326855
Surface Hole Longitude: -111.957019

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-07-07 Obtained License
1981-08-19 Finished Drilling
1981-08-19 Well Log Performed
1981-08-19 Well Mode changed to Drilled and Cased
1981-08-20 Drill Stem Test Performed
1981-08-21 Production Casing Operation Performed
1981-09-16 Perforation Treatment Performed - Jet Perforation
1981-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-19 Well Began Production
1981-09-19 Well Fluid changed to Crude Oil
1981-09-19 Well Mode changed to Pumping
1981-09-21 Perforation Treatment Performed - Fractured
1997-04-17 Perforation Treatment Performed - Jet Perforation
1997-04-17 Well Log Performed
2005-10-01 Well Fluid changed to Crude Oil
2005-10-01 Well Mode changed to Suspended
2009-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-12 Plug Back Performed
2009-12-07 Well Fluid changed to Crude Oil
2009-12-07 Well Mode changed to Abandoned Zone
2015-11-25 Well Abandoned
2015-11-25 Well Fluid changed to Crude Oil
2015-11-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-09-16 Perforation 1025.00 1025.50 13
1981-09-16 Perforation 1026.00 1027.50 13
1981-09-16 Perforation 1029.50 1030.50 13
1981-09-16 Perforation 1033.00 1034.00 13
1981-09-17 Acid Treatment 1025.00 1034.00 0
1981-09-21 Fracture 1025.00 1034.00 0
1997-04-17 Perforation 1023.00 1028.00 13
2009-07-12 Packing Device Capped w/Cement 1012.30 1020.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1136 0.0 0.0 0.0
1982 5431 0.0 0.0 0.0
1983 4652 0.0 0.0 0.0
1984 4063 0.0 0.0 0.0
1985 6443 0.0 0.0 0.0
1986 7003 0.0 0.0 0.0
1987 6793 0.0 0.0 0.0
1988 6699 0.0 0.0 0.0
1989 6218 0.0 0.0 0.0
1990 5248 0.0 0.0 0.0
1991 4657 0.0 0.0 0.0
1992 7802 0.0 0.0 0.0
1993 8747 0.0 0.0 0.0
1994 8352 0.0 0.0 0.0
1995 8655 0.0 0.0 0.0
1996 7870 0.0 0.0 0.0
1997 7116 0.0 0.0 0.0
1998 4047 0.0 0.0 0.0
1999 3262 0.0 0.0 0.0
2000 7824 0.0 0.0 0.0
2001 6909 0.0 0.0 0.0
2002 8476 0.0 0.0 0.0
2003 6604 0.0 0.0 0.0
2004 6133 0.0 0.0 0.0

For data sources see[5]

References