X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164150803002

Well Details

Well ID: 0164150803002
Loading map...
Location: 00/03-08-016-15W4/2
Location Alias: 00/03-08-16-15 W4M
Location Alias 2: 00/03-08-016-15 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 15
Section: 08
County/Municipality: County of Newell
Well Name: TXNE 2-8DV ALDSON 3-8-16-15
Operator Name: Torxen Energy Ltd.
License Number: 0435086
License Date: 2011-07-12
License Status: Suspension
Spud Date: 2011-07-20
Final Drill Date: 2011-07-23
Well Total Depth: 1199.00 m
Surface Hole Latitude: 50.325001
Surface Hole Longitude: -112.030534

For data sources see[1][2]

Well History

Date Event
2011-07-08 Well Log Performed
2011-07-12 Obtained License
2011-07-20 Surface Casing Operation Performed
2011-07-20 Well Log Performed
2011-07-21 Direction Drilling Operation Performed - Deviate
2011-07-23 Finished Drilling
2011-07-23 Production Casing Operation Performed
2011-07-23 Well Log Performed
2011-07-23 Well Mode changed to Drilled and Cased
2011-07-24 Rig Released
2011-08-09 Perforation Treatment Performed - Jet Perforation
2011-08-09 Well Log Performed
2011-08-15 Perforation Treatment Performed - Jet Perforation
2011-08-15 Well Log Performed
2011-08-20 Perforation Treatment Performed - Fractured
2011-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-29 Plug Back Performed
2011-09-29 Well Log Performed
2011-10-06 Well Began Production
2011-10-06 Well Fluid changed to Crude Oil
2011-10-06 Well Mode changed to Pumping
2012-06-04 Perforation Treatment Performed - Fractured
2014-07-01 Well Fluid changed to Crude Oil
2014-07-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-21 450.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-09 Perforation 1132.50 1134.00 20
2011-08-15 Perforation 1077.00 1083.00 20
2011-08-20 Fracture 1077.00 1083.00 0
2011-09-29 Packing Device Capped w/Cement 1121.00 1129.00 0
2012-06-04 Fracture 1077.00 1083.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1980 0.0 0.0 0.0
2012 4192 0.0 0.0 0.0
2013 3972 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References