If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164150207000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.316024,"lon":-111.962754,"icon":""}]} |
Location: 00/07-02-016-15W4/0 | |
Location Alias: 00/07-02-16-15 W4M | |
Location Alias 2: 00/07-02-016-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 15 | |
Section: 02 | |
County/Municipality: County of Newell | |
Well Name: TXNE ALDSON 7-2-16-15 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0098196 | |
License Date: 1982-10-22 | |
License Status: Suspension | |
Spud Date: 1982-12-01 | |
Final Drill Date: 1982-12-08 | |
Well Total Depth: 1067.00 m | |
Surface Hole Latitude: 50.316024 | |
Surface Hole Longitude: -111.962754 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-10-22 | Obtained License |
1982-12-08 | Finished Drilling |
1982-12-08 | Well Mode changed to Drilled and Cased |
1982-12-09 | Drill Stem Test Performed |
1982-12-10 | Production Casing Operation Performed |
1983-02-05 | Perforation Treatment Performed - Jet Perforation |
1983-04-01 | Well Began Production |
1983-04-01 | Well Fluid changed to Crude Oil |
1983-04-01 | Well Mode changed to Pumping |
1997-05-01 | Well Fluid changed to Crude Oil |
1997-05-01 | Well Mode changed to Suspended |
1999-08-23 | Well Log Performed |
1999-12-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-12-08 | Perforation Treatment Performed - Jet Perforation |
1999-12-08 | Plug Back Performed |
1999-12-08 | Well Fluid changed to Crude Oil |
1999-12-08 | Well Mode changed to Abandoned Zone |
1999-12-10 | Perforation Treatment Performed - Jet Perforation |
1999-12-11 | Well Log Performed |
2008-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-03-12 | Plug Back Performed |
2008-03-12 | Well Log Performed |
2008-03-18 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-02-05 | Perforation | 1028.00 | 1032.30 | 13 |
1999-12-08 | Packing Device Capped w/Cement | 1023.00 | 1026.00 | 0 |
1999-12-08 | Perforation | 1009.50 | 1010.50 | 17 |
1999-12-10 | Perforation | 1006.70 | 1007.20 | 17 |
2008-03-12 | Packing Device Capped w/Cement | 991.80 | 999.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 4766 | 0.0 | 0.0 | 0.0 |
1984 | 7758 | 0.0 | 0.0 | 0.0 |
1985 | 8184 | 0.0 | 0.0 | 0.0 |
1986 | 8177 | 0.0 | 0.0 | 0.0 |
1987 | 7681 | 0.0 | 0.0 | 0.0 |
1988 | 8412 | 0.0 | 0.0 | 0.0 |
1989 | 8376 | 0.0 | 0.0 | 0.0 |
1990 | 8338 | 0.0 | 0.0 | 0.0 |
1991 | 8413 | 0.0 | 0.0 | 0.0 |
1992 | 8417 | 0.0 | 0.0 | 0.0 |
1993 | 8179 | 0.0 | 0.0 | 0.0 |
1994 | 8254 | 0.0 | 0.0 | 0.0 |
1995 | 6366 | 0.0 | 0.0 | 0.0 |
1996 | 8207 | 0.0 | 0.0 | 0.0 |
1997 | 647 | 0.0 | 0.0 | 0.0 |
For data sources see[5]