If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164150202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.313269,"lon":-111.962773,"icon":""}]} |
Location: 00/02-02-016-15W4/0 | |
Location Alias: 00/02-02-16-15 W4M | |
Location Alias 2: 00/02-02-016-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 15 | |
Section: 02 | |
County/Municipality: County of Newell | |
Well Name: TXNE ALDSON 2-2-16-15 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0083173 | |
License Date: 1980-06-02 | |
License Status: Suspension | |
Spud Date: 1980-06-23 | |
Final Drill Date: 1980-06-29 | |
Well Total Depth: 1077.00 m | |
Surface Hole Latitude: 50.313269 | |
Surface Hole Longitude: -111.962773 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-06-02 | Obtained License |
1980-06-29 | Finished Drilling |
1980-06-29 | Well Log Performed |
1980-06-29 | Well Mode changed to Drilled and Cased |
1980-06-30 | Drill Stem Test Performed |
1980-07-01 | Drill Stem Test Performed |
1980-07-02 | Production Casing Operation Performed |
1980-08-12 | Perforation Treatment Performed - Jet Perforation |
1980-08-14 | Perforation Treatment Performed - Jet Perforation |
1980-08-15 | Perforation Treatment Performed - Acid Wash - No Pressure |
1980-08-16 | Perforation Treatment Performed - Cement Squeeze |
1980-08-20 | Perforation Treatment Performed - Jet Perforation |
1980-08-21 | Perforation Treatment Performed - Fractured |
1980-11-21 | Well Began Production |
1980-11-21 | Well Fluid changed to Crude Oil |
1980-11-21 | Well Mode changed to Flowing |
1987-02-19 | Well Fluid changed to Crude Oil |
1987-02-19 | Well Mode changed to Pumping |
1988-01-24 | Well Log Performed |
1988-01-25 | Perforation Treatment Performed - Jet Perforation |
1992-01-16 | Perforation Treatment Performed - Jet Perforation |
1992-01-21 | Perforation Treatment Performed - Jet Perforation |
1992-01-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-01-22 | Perforation Treatment Performed - Cement Squeeze |
1992-01-27 | Perforation Treatment Performed - Jet Perforation |
1995-02-17 | Well Log Performed |
1995-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-02-21 | Well Log Performed |
1995-02-22 | Perforation Treatment Performed - Cement Squeeze |
1995-02-26 | Perforation Treatment Performed - Jet Perforation |
1995-02-26 | Well Log Performed |
1999-12-14 | Perforation Treatment Performed - Jet Perforation |
1999-12-14 | Well Log Performed |
1999-12-15 | Well Log Performed |
1999-12-16 | Well Log Performed |
2003-09-27 | Well Log Performed |
2003-09-29 | Well Log Performed |
2003-09-30 | Perforation Treatment Performed - Jet Perforation |
2005-11-01 | Well Fluid changed to Crude Oil |
2005-11-01 | Well Mode changed to Suspended |
2010-10-06 | Well Fluid changed to Crude Oil |
2010-10-06 | Well Mode changed to Pumping |
2012-02-01 | Well Fluid changed to Crude Oil |
2012-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-08-12 | Perforation | 1034.00 | 1039.00 | 6 |
1992-01-22 | Acid Treatment | 1017.00 | 1021.00 | 0 |
1992-01-22 | Cement Squeeze | 1017.00 | 1021.00 | 0 |
1992-01-27 | Perforation | 1020.00 | 1021.00 | 13 |
1995-02-21 | Acid Treatment | 1019.00 | 1038.00 | 0 |
1995-02-22 | Cement Squeeze | 1019.00 | 1038.00 | 0 |
1995-02-26 | Perforation | 1022.00 | 1023.00 | 14 |
1999-12-14 | Perforation | 1018.50 | 1019.50 | 17 |
2003-09-30 | Perforation | 1007.00 | 1013.00 | 17 |
1980-08-14 | Perforation | 1039.00 | 1040.00 | 6 |
1980-08-15 | Acid Wash | 1034.00 | 1040.00 | 0 |
1980-08-16 | Cement Squeeze | 1034.00 | 1040.00 | 0 |
1980-08-20 | Perforation | 1035.00 | 1038.00 | 4 |
1980-08-21 | Fracture | 1035.00 | 1038.00 | 0 |
1988-01-25 | Perforation | 1023.00 | 1026.00 | 13 |
1992-01-16 | Perforation | 1019.00 | 1021.00 | 13 |
1992-01-21 | Perforation | 1017.00 | 1019.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 961 | 0.0 | 0.0 | 0.0 |
1981 | 6907 | 0.0 | 0.0 | 0.0 |
1982 | 5689 | 0.0 | 0.0 | 0.0 |
1983 | 4410 | 0.0 | 0.0 | 0.0 |
1984 | 5209 | 0.0 | 0.0 | 0.0 |
1985 | 7496 | 0.0 | 0.0 | 0.0 |
1986 | 8347 | 0.0 | 0.0 | 0.0 |
1987 | 8270 | 0.0 | 0.0 | 0.0 |
1988 | 8323 | 0.0 | 0.0 | 0.0 |
1989 | 8373 | 0.0 | 0.0 | 0.0 |
1990 | 8458 | 0.0 | 0.0 | 0.0 |
1991 | 7813 | 0.0 | 0.0 | 0.0 |
1992 | 3607 | 0.0 | 0.0 | 0.0 |
1993 | 272 | 0.0 | 0.0 | 0.0 |
1995 | 6576 | 0.0 | 0.0 | 0.0 |
1996 | 8333 | 0.0 | 0.0 | 0.0 |
1997 | 6551 | 0.0 | 0.0 | 0.0 |
1998 | 7780 | 0.0 | 0.0 | 0.0 |
1999 | 8252 | 0.0 | 0.0 | 0.0 |
2000 | 7850 | 0.0 | 0.0 | 0.0 |
2001 | 7297 | 0.0 | 0.0 | 0.0 |
2002 | 264 | 0.0 | 0.0 | 0.0 |
2003 | 648 | 0.0 | 0.0 | 0.0 |
2004 | 48 | 0.0 | 0.0 | 0.0 |
2010 | 2060 | 0.0 | 0.0 | 0.0 |
2011 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[5]