X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164141808005

Well Details

Well ID: 0164141808005
Loading map...
Location: 00/08-18-016-14W4/5
Location Alias: 00/08-18-16-14 W4M
Location Alias 2: 00/08-18-016-14 W4/05
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 14
Section: 18
County/Municipality: County of Newell
Well Name: TXNE 8D JOHNSON 8-18-16-14
Operator Name: Torxen Energy Ltd.
License Number: 0218429
License Date: 1998-11-03
License Status: Issued
Spud Date: 1998-11-06
Final Drill Date: 1998-11-11
Well Total Depth: 1080.00 m
Surface Hole Latitude: 50.345224
Surface Hole Longitude: -111.907128

For data sources see[1][2]

Well History

Date Event
1998-11-03 Obtained License
1998-11-07 Surface Casing Operation Performed
1998-11-07 Well Log Performed
1998-11-08 Direction Drilling Operation Performed - Deviate
1998-11-11 Finished Drilling
1998-11-11 Well Log Performed
1998-11-11 Well Mode changed to Drilled and Cased
1998-11-12 Production Casing Operation Performed
1998-11-12 Rig Released
1998-11-25 Well Log Performed
1998-12-06 Well Log Performed
1998-12-07 Perforation Treatment Performed - Jet Perforation
1998-12-12 Perforation Treatment Performed - Fractured
1998-12-14 Well Log Performed
1998-12-15 Perforation Treatment Performed - Jet Perforation
2000-04-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-04-09 Plug Back Performed
2000-04-10 Perforation Treatment Performed - Jet Perforation
2000-04-10 Well Log Performed
2000-04-11 Well Log Performed
2000-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-12 Perforation Treatment Performed - Jet Perforation
2000-09-12 Plug Back Performed
2000-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-13 Perforation Treatment Performed - Jet Perforation
2000-09-13 Plug Back Performed
2000-09-13 Well Log Performed
2000-09-13 Well Mode changed to Drilled and Cased
2000-09-14 Well Log Performed
2000-09-15 Well Began Production
2000-09-15 Well Fluid changed to Gas
2000-09-15 Well Mode changed to Flowing
2001-08-01 Well Fluid changed to Gas
2001-08-01 Well Mode changed to Suspended
2006-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-12 Plug Back Performed
2006-08-12 Well Fluid changed to Gas
2006-08-12 Well Log Performed
2006-08-12 Well Mode changed to Abandoned Zone
2006-08-14 Perforation Treatment Performed - Jet Perforation
2006-08-20 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-11-08 455.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-12-07 Perforation 1012.00 1013.00 20
2000-09-12 Packing Device Capped w/Cement 804.00 814.00 0
2000-09-12 Perforation 798.50 800.00 20
2000-09-12 Perforation 784.50 785.50 20
2000-09-13 Packing Device Capped w/Cement 773.00 783.00 0
2000-09-13 Perforation 762.50 763.00 20
2006-08-12 Packing Device Capped w/Cement 745.00 753.30 0
2006-08-14 Perforation 664.00 666.00 7
2006-08-20 Fracture 664.00 666.00 0
1998-12-12 Fracture 1012.00 1013.00 0
1998-12-15 Perforation 855.80 855.90 20
1998-12-15 Perforation 853.20 853.70 17
1998-12-15 Perforation 854.30 854.80 17
1998-12-15 Perforation 855.50 856.80 17
2000-04-09 Packing Device Capped w/Cement 1000.00 1010.00 0
2000-04-10 Perforation 817.00 817.50 20
2000-09-12 Packing Device Capped w/Cement 839.00 849.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1855 0.0 0.0 0.0
2001 4007 0.0 0.0 0.0
2002 24 0.0 0.0 0.0

For data sources see[6]

References