X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164133515030

Well Details

Well ID: 0164133515030
Loading map...
Location: 03/15-35-016-13W4/0
Location Alias: 03/15-35-16-13 W4M
Location Alias 2: 03/15-35-016-13 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 13
Section: 35
County/Municipality: County of Newell
Well Name: TXNE 15C-27 HZ BANTRY 15-35-16-13
Operator Name: Torxen Energy Ltd.
License Number: 0493744
License Date: 2019-02-08
License Status: Issued
Spud Date: 2019-03-29
Final Drill Date: 2019-04-02
Well Total Depth: 3014.00 m
Surface Hole Latitude: 50.382294
Surface Hole Longitude: -111.709833

For data sources see[1][2]

Well History

Date Event
2019-02-08 Obtained License
2019-03-29 Surface Casing Operation Performed
2019-03-30 Direction Drilling Operation Performed - Deviate
2019-03-31 Direction Drilling Operation Performed - Horizontal
2019-03-31 Intermediate Casing Operation Performed
2019-04-02 Finished Drilling
2019-04-02 Well Log Performed
2019-04-02 Well Mode changed to Drilled and Cased
2019-04-03 Liner Casing Operation Performed
2019-04-03 Perforation Treatment Performed - Open-Hole Completion
2019-04-03 Rig Released
2019-04-03 Well Log Performed
2019-04-19 Well Fluid changed to Crude Oil
2019-04-19 Well Mode changed to Drilling and Completing
2019-04-22 Perforation Treatment Performed - Jet Perforation
2019-04-23 Perforation Treatment Performed - Jet Perforation
2019-05-16 Well Began Production
2019-05-16 Well Fluid changed to Crude Oil
2019-05-16 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-03-29 Bonanza Drilling Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-30 729.80 Deviate (5 - 79 degrees)
2019-03-31 1165.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-04-03 Open Hole/Barefoot Completion 1239.00 3014.00 0
2019-04-22 Perforation 2234.60 2234.70 1
2019-04-22 Perforation 2138.10 2138.20 1
2019-04-23 Perforation 2042.10 2042.20 1
2019-04-23 Perforation 1972.70 1972.80 1
2019-04-23 Perforation 1848.40 1848.50 1
2019-04-23 Perforation 1766.20 1766.30 1
2019-04-23 Perforation 1675.30 1675.40 1
2019-04-23 Perforation 1572.30 1572.40 1
2019-04-23 Perforation 1479.90 1480.00 1
2019-04-23 Perforation 1388.40 1388.50 1
2019-04-22 Perforation 2970.90 2971.00 1
2019-04-23 Perforation 1296.80 1296.90 1
2019-04-22 Perforation 2893.40 2893.50 1
2019-04-22 Perforation 2783.80 2783.90 1
2019-04-22 Perforation 2687.30 2687.40 1
2019-04-22 Perforation 2604.90 2605.00 1
2019-04-22 Perforation 2508.60 2508.70 1
2019-04-22 Perforation 2427.40 2427.50 1
2019-04-22 Perforation 2317.30 2317.40 1

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5409 0.0 0.0 0.0
2020 2142 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-03 No Incident Encountered 0.00 0.00
2019-04-26 No Incident Encountered 0.00 0.00

For data sources see[8]

References