If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164132210020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.382159,"lon":-111.709832,"icon":""}]} |
Location: 02/10-22-016-13W4/0 | |
Location Alias: 02/10-22-16-13 W4M | |
Location Alias 2: 02/10-22-016-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 13 | |
Section: 22 | |
County/Municipality: County of Newell | |
Well Name: TXNE 15C-27 HZ ALDSON 10-22-16-13 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0493743 | |
License Date: 2019-02-08 | |
License Status: Issued | |
Spud Date: 2019-04-04 | |
Final Drill Date: 2019-04-08 | |
Well Total Depth: 2935.00 m | |
Surface Hole Latitude: 50.382159 | |
Surface Hole Longitude: -111.709832 |
Date | Event |
---|---|
2019-02-08 | Obtained License |
2019-04-04 | Surface Casing Operation Performed |
2019-04-05 | Direction Drilling Operation Performed - Deviate |
2019-04-06 | Direction Drilling Operation Performed - Horizontal |
2019-04-06 | Intermediate Casing Operation Performed |
2019-04-08 | Finished Drilling |
2019-04-08 | Liner Casing Operation Performed |
2019-04-08 | Well Log Performed |
2019-04-08 | Well Mode changed to Drilled and Cased |
2019-04-09 | Perforation Treatment Performed - Open-Hole Completion |
2019-04-09 | Rig Released |
2019-06-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-05 | Well Fluid changed to Crude Oil |
2019-06-05 | Well Mode changed to Drilling and Completing |
2019-06-20 | Well Began Production |
2019-06-20 | Well Fluid changed to Crude Oil |
2019-06-20 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-04-04 | Bonanza Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-04-05 | 756.80 | Deviate (5 - 79 degrees) |
2019-04-06 | 1100.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-04-09 | Open Hole/Barefoot Completion | 1147.00 | 2935.00 | 0 |
2019-06-04 | Multi-Stage Fracture | 2278.60 | 2278.70 | 0 |
2019-06-04 | Multi-Stage Fracture | 2113.60 | 2113.70 | 0 |
2019-06-04 | Multi-Stage Fracture | 1952.60 | 1952.70 | 0 |
2019-06-04 | Multi-Stage Fracture | 1872.60 | 1872.70 | 0 |
2019-06-04 | Multi-Stage Fracture | 1792.50 | 1792.60 | 0 |
2019-06-04 | Multi-Stage Fracture | 1688.10 | 1688.20 | 0 |
2019-06-04 | Multi-Stage Fracture | 1582.90 | 1583.00 | 0 |
2019-06-04 | Multi-Stage Fracture | 1514.60 | 1514.70 | 0 |
2019-06-04 | Multi-Stage Fracture | 1408.60 | 1408.70 | 0 |
2019-06-04 | Multi-Stage Fracture | 1303.40 | 1303.50 | 0 |
2019-06-03 | Multi-Stage Fracture | 2907.70 | 2907.80 | 0 |
2019-06-04 | Multi-Stage Fracture | 1223.60 | 1223.70 | 0 |
2019-06-03 | Multi-Stage Fracture | 2866.30 | 2866.40 | 0 |
2019-06-03 | Multi-Stage Fracture | 2798.80 | 2798.90 | 0 |
2019-06-03 | Multi-Stage Fracture | 2705.50 | 2705.60 | 0 |
2019-06-03 | Multi-Stage Fracture | 2598.30 | 2598.40 | 0 |
2019-06-03 | Multi-Stage Fracture | 2518.70 | 2518.80 | 0 |
2019-06-04 | Multi-Stage Fracture | 2426.20 | 2426.30 | 0 |
2019-06-04 | Multi-Stage Fracture | 2346.70 | 2346.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-06-03 | 2019-06-04 | 1,010 | 0 | N/A |
2 | 2019-06-04 | 2019-06-04 | 1,010 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water (Including Mix Water Supplied by Client)* | 7732-18-5 | 100 | 86.6785 | N/A | |||
YF120Flex. N002 | Schlumberger | Quartz. Crystalline silica | 14808-60-7 | 100 | 15.6569 | N/A | ||
YF120Flex. N002 | Schlumberger | Energizing Fluid | 1.2.4 Trimethylbenzene (impurity) | 95-63-6 | 100 | 0.0004 | N/A | |
2.2`.2-nitrilotriethanol"" | 102-71-6 | 100 | 0.0305 | N/A | ||||
2-hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.1468 | N/A | ||||
2-Propen-1-aminium. N.N-dimethyl-N-2-propen-1-yl-. chloride | 26062-79-3 | 100 | 0.0038 | N/A | ||||
Acetic acid | 64-19-7 | 100 | 0.0004 | N/A | ||||
Acetic acid. potassium salt | 127-08-2 | 100 | 0.0003 | N/A | ||||
Alcohol. C11-14. ethoxylated | 78330-21-9 | 100 | 0.0163 | N/A | ||||
Alcohols. C7-9-iso-. C8-rich. ethoxylated | 78330-19-5 | 100 | 0.0251 | N/A | ||||
Alcohols. C9-11-iso-. C10-rich. ethoxylated | 78330-20-8 | 100 | 0.0235 | N/A | ||||
Amines. dicoco alkylmethyl | 61788-62-3 | 100 | 0 | N/A | ||||
Benzenemethanaminium. N.N-dimethyl-N tetradecyl-. chloride | 139-08-2 | 100 | 0.0019 | N/A | ||||
Benzenemethanaminium. N-hexadecylN.N dimethyl-.chloride | 122-18-9 | 100 | 0.0004 | N/A | ||||
Diammonium peroxidisulphate | 7727-54-0 | 100 | 0.0207 | N/A | ||||
Dicoco dimethyl quaternary ammonium chloride | 61789-77-3 | 100 | 0.0003 | N/A | ||||
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin | 30846-35-6 | 100 | 0.0272 | N/A | ||||
Glycerol | 56-81-5 | 100 | 0.0192 | N/A | ||||
Guar gum | 9000-30-0 | 100 | 0.1991 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.2081 | N/A | ||||
N.N-Dimethyl-N-dodecyl benzylaminium chloride | 139-07-1 | 100 | 0.0056 | N/A | ||||
N-Coco. 1.3-diaminopropane di-acetate | 61791-64-8 | 100 | 0.0009 | N/A | ||||
Naphthalene (Impurity) | 91-20-3 | 100 | 0.0006 | N/A | ||||
Nitrogen. liquid form | 7727-37-9 | 100 | 4.2933 | N/A | ||||
Non-crystalline silica (impurity) | 7631-86-9 | 100 | 0.0004 | N/A | ||||
Oxirane. Methyl-. polymer with Oxirane | 11/6/9003 | 100 | 0.0368 | N/A | ||||
Poly(oxy-1.2-ethanediyl).a-hydro-w-hydroxy- Ethane-1.2-diol. |
25322-68-3 | 100 | 0.008 | N/A | ||||
Polyethylene glycol monohexyl ether | 31726-34-8 | 100 | 0.0041 | N/A | ||||
Potassium borate | 1332-77-0 | 100 | 0.0589 | N/A | ||||
Potassium hydroxide | 1310-58-3 | 100 | 0.0217 | N/A | ||||
Potassium oleate | 143-18-0 | 100 | 0.0004 | N/A | ||||
Propan-2-ol | 67-63-0 | 100 | 0.0016 | N/A | ||||
Solvent naphtha (petroleum). heavy arom. | 64742-94-5 | 100 | 0.0053 | N/A | ||||
2 | YF120Flex. N002 | Schlumberger | Energizing Fluid | Dextrin | 9004-53-9 | 100 | 0 | N/A |
Hemicellulase enzyme | 9012-54-8 | 100 | 0 | N/A | ||||
Lactose | 63-42-3 | 100 | 0.0166 | N/A | ||||
Maltodextrin | 9050-36-6 | 100 | 0.0001 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-05-27 | 2019-05-29 | Surface Water - River | 546 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 4597 | 0.0 | 0.0 | 0.0 |
2020 | 2148 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-04-09 | No Incident Encountered | 0.00 | 0.00 |
2019-06-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]