If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164131406002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.344808,"lon":-111.691427,"icon":""}]} |
Location: 00/06-14-016-13W4/2 | |
Location Alias: 00/06-14-16-13 W4M | |
Location Alias 2: 00/06-14-016-13 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 13 | |
Section: 14 | |
County/Municipality: County of Newell | |
Well Name: TXNE ALDSON 6-14-16-13 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0274060 | |
License Date: 2002-09-25 | |
License Status: Issued | |
Spud Date: 2002-12-31 | |
Final Drill Date: 2002-12-31 | |
Well Total Depth: 680.00 m | |
Surface Hole Latitude: 50.344808 | |
Surface Hole Longitude: -111.691427 |
Date | Event |
---|---|
2002-09-25 | Obtained License |
2002-12-21 | Conductor Casing Operation Performed |
2002-12-31 | Finished Drilling |
2002-12-31 | Well Mode changed to Drilled and Cased |
2003-01-01 | Production Casing Operation Performed |
2003-01-01 | Rig Released |
2003-01-09 | Well Log Performed |
2003-01-14 | Perforation Treatment Performed - Jet Perforation |
2003-01-20 | Perforation Treatment Performed - Fractured |
2005-03-08 | Perforation Treatment Performed - Jet Perforation |
2005-03-11 | Perforation Treatment Performed - Fractured |
2005-03-16 | Well Began Production |
2005-03-16 | Well Fluid changed to Gas |
2005-03-16 | Well Mode changed to Flowing |
2005-05-30 | Perforation Treatment Performed - Jet Perforation |
2005-07-13 | Perforation Treatment Performed - Fractured |
2005-08-01 | Well Structure changed to Commingled |
2012-02-14 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-01-14 | Perforation | 616.50 | 618.50 | 7 |
2005-05-30 | Perforation | 409.00 | 411.00 | 7 |
2005-05-30 | Perforation | 350.00 | 352.00 | 7 |
2005-05-30 | Perforation | 340.00 | 342.00 | 7 |
2005-05-30 | Perforation | 325.00 | 327.00 | 7 |
2005-05-30 | Perforation | 313.00 | 315.00 | 7 |
2005-05-30 | Perforation | 301.00 | 303.00 | 7 |
2005-05-30 | Perforation | 288.00 | 290.00 | 7 |
2005-07-13 | Fracture | 423.00 | 425.00 | 0 |
2005-07-13 | Fracture | 409.00 | 411.00 | 0 |
2005-07-13 | Fracture | 350.00 | 352.00 | 0 |
2003-01-20 | Fracture | 616.50 | 618.50 | 0 |
2005-07-13 | Fracture | 340.00 | 342.00 | 0 |
2005-07-13 | Fracture | 325.00 | 327.00 | 0 |
2005-07-13 | Fracture | 313.00 | 315.00 | 0 |
2005-07-13 | Fracture | 301.00 | 303.00 | 0 |
2005-07-13 | Fracture | 288.00 | 290.00 | 0 |
2012-02-14 | Perforation | 202.10 | 203.10 | 13 |
2012-02-14 | Perforation | 198.90 | 199.90 | 13 |
2012-02-14 | Perforation | 195.00 | 196.00 | 13 |
2012-02-14 | Perforation | 193.50 | 194.50 | 13 |
2012-02-14 | Perforation | 192.00 | 193.00 | 13 |
2005-03-08 | Perforation | 388.00 | 390.00 | 7 |
2012-02-14 | Perforation | 187.50 | 188.50 | 13 |
2012-02-14 | Perforation | 185.50 | 186.50 | 13 |
2005-03-08 | Perforation | 378.00 | 380.00 | 7 |
2005-03-08 | Perforation | 366.00 | 368.00 | 7 |
2005-03-11 | Fracture | 388.00 | 390.00 | 0 |
2005-03-11 | Fracture | 378.00 | 380.00 | 0 |
2005-03-11 | Fracture | 366.00 | 368.00 | 0 |
2005-05-30 | Perforation | 423.00 | 425.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2903 | 0.0 | 0.0 | 0.0 |
For data sources see[5]