X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164130715000

Well Details

Well ID: 0164130715000
Loading map...
Location: 00/15-07-016-13W4/0
Location Alias: 00/15-07-16-13 W4M
Location Alias 2: 00/15-07-016-13 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 13
Section: 07
County/Municipality: County of Newell
Well Name: TXNE 15D ALDSON 15-7-16-13
Operator Name: Torxen Energy Ltd.
License Number: 0228481
License Date: 1999-11-09
License Status: Issued
Spud Date: 1999-11-10
Final Drill Date: 1999-11-15
Well Total Depth: 1091.00 m
Surface Hole Latitude: 50.338567
Surface Hole Longitude: -111.778992

For data sources see[1][2]

Well History

Date Event
1999-11-09 Obtained License
1999-11-11 Surface Casing Operation Performed
1999-11-12 Direction Drilling Operation Performed - Deviate
1999-11-15 Finished Drilling
1999-11-15 Well Log Performed
1999-11-16 Production Casing Operation Performed
1999-11-16 Rig Released
1999-11-16 Well Mode changed to Drilled and Cased
1999-11-18 Well Log Performed
1999-11-19 Well Log Performed
1999-11-27 Perforation Treatment Performed - Jet Perforation
1999-11-27 Well Log Performed
2000-01-23 Well Began Production
2000-01-23 Well Fluid changed to Gas
2000-01-23 Well Mode changed to Flowing
2002-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-05 Plug Back Performed
2002-07-05 Well Fluid changed to Gas
2002-07-05 Well Mode changed to Abandoned Zone
2003-02-03 Well Log Performed
2003-02-06 Perforation Treatment Performed - Jet Perforation
2003-02-11 Perforation Treatment Performed - Fractured
2010-11-28 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-11-12 220.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-11-27 Perforation 843.00 847.00 17
2002-07-05 Packing Device Capped w/Cement 829.00 839.00 0
2003-02-06 Perforation 640.00 642.00 7
2003-02-11 Fracture 640.00 642.00 0
2010-11-28 Perforation 207.50 208.50 13
2010-11-28 Perforation 203.50 204.50 13
2010-11-28 Perforation 199.50 201.00 13
2010-11-28 Perforation 189.50 190.50 13
2010-11-28 Perforation 186.00 187.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 7169 0.0 0.0 0.0
2001 3823 0.0 0.0 0.0
2002 1 0.0 0.0 0.0

For data sources see[6]

References