X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164123214020

Well Details

Well ID: 0164123214020
Loading map...
Location: 02/14-32-016-12W4/0
Location Alias: 02/14-32-16-12 W4M
Location Alias 2: 02/14-32-016-12 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 32
County/Municipality: County of Newell
Well Name: ESSOVEN BANTRY 14-32-16-12
Operator Name: Imperial Oil Resources Limited
License Number: 0046575
License Date: 1973-07-17
License Status: RecCertified
Spud Date: 1973-08-05
Final Drill Date: 1973-08-06
Well Total Depth: 400.80 m
Surface Hole Latitude: 50.397030
Surface Hole Longitude: -111.620431

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-07-17 Obtained License
1973-08-06 Finished Drilling
1973-08-06 Production Casing Operation Performed
1973-08-06 Well Mode changed to Drilled and Cased
1973-09-19 Perforation Treatment Performed - Jet Perforation
1973-09-19 Perforation Treatment Performed - Selective Jet Perforations
1973-09-20 Perforation Treatment Performed - Fractured
1973-11-10 Well Began Production
1973-11-10 Well Fluid changed to Gas
1973-11-10 Well Mode changed to Flowing
1996-08-01 Well Fluid changed to Gas
1996-08-01 Well Mode changed to Suspended
1996-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-02 Plug Back Performed
1996-08-02 Well Fluid changed to Gas
1996-08-02 Well Mode changed to Abandoned Zone
1996-09-16 Well Abandoned
1996-09-16 Well Fluid changed to Gas
1996-09-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-09-19 Perforation 310.60 311.20 10
1973-09-19 Perforation 315.20 316.10 7
1973-09-19 Perforation 318.20 318.80 3
1973-09-19 Perforation 322.50 323.40 3
1973-09-19 Perforation 354.50 355.10 3
1973-09-19 Perforation 358.40 359.10 3
1973-09-19 Selective Jet Perforations 379.20 379.20 7
1973-09-20 Fracture 310.60 379.20 0
1996-08-02 Packing Device Capped w/Cement 294.00 302.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 1255 0.0 0.0 0.0
1974 8577 0.0 0.0 0.0
1975 8134 0.0 0.0 0.0
1976 8287 0.0 0.0 0.0
1977 8469 0.0 0.0 0.0
1978 7274 0.0 0.0 0.0
1979 7477 0.0 0.0 0.0
1980 8481 0.0 0.0 0.0
1981 8641 0.0 0.0 0.0
1982 5957 0.0 0.0 0.0
1983 5610 0.0 0.0 0.0
1984 8688 0.0 0.0 0.0
1985 8563 0.0 0.0 0.0
1986 6025 0.0 0.0 0.0
1987 6790 0.0 0.0 0.0
1988 8598 0.0 0.0 0.0
1989 8487 0.0 0.0 0.0
1990 7603 0.0 0.0 0.0
1991 8629 0.0 0.0 0.0
1992 8666 0.0 0.0 0.0
1993 8585 0.0 0.0 0.0
1994 8753 0.0 0.0 0.0
1995 8725 0.0 0.0 0.0
1996 5110 0.0 0.0 0.0

For data sources see[5]

References