X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164123013000

Well Details

Well ID: 0164123013000
Loading map...
Location: 00/13-30-016-12W4/0
Location Alias: 00/13-30-16-12 W4M
Location Alias 2: 00/13-30-016-12 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 30
County/Municipality: County of Newell
Well Name: ESSOVEN BANTRY 13-30-16-12
Operator Name: Imperial Oil Resources Limited
License Number: 0046573
License Date: 1973-07-17
License Status: RecCertified
Spud Date: 1973-07-29
Final Drill Date: 1973-07-30
Well Total Depth: 397.80 m
Surface Hole Latitude: 50.382681
Surface Hole Longitude: -111.651225

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-07-17 Obtained License
1973-07-30 Finished Drilling
1973-07-30 Production Casing Operation Performed
1973-07-30 Well Mode changed to Drilled and Cased
1973-09-19 Perforation Treatment Performed - Fractured
1973-09-19 Perforation Treatment Performed - Jet Perforation
1973-11-09 Well Began Production
1973-11-09 Well Fluid changed to Gas
1973-11-09 Well Mode changed to Flowing
1975-10-23 Perforation Treatment Performed - Jet Perforation
1975-10-27 Perforation Treatment Performed - Fractured
1998-05-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-13 Plug Back Performed
1998-05-13 Well Fluid changed to Gas
1998-05-13 Well Mode changed to Suspended
1998-05-21 Well Abandoned
1998-05-21 Well Fluid changed to Gas
1998-05-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-09-19 Perforation 315.20 316.40 3
1975-10-23 Perforation 307.20 308.20 7
1975-10-23 Perforation 309.10 309.70 7
1975-10-27 Fracture 292.30 309.70 0
1998-05-13 Packing Device Capped w/Cement 277.00 285.00 0
1973-09-19 Perforation 320.60 321.90 3
1973-09-19 Perforation 328.00 330.40 3
1973-09-19 Perforation 353.00 353.60 3
1973-09-19 Perforation 358.40 359.10 3
1973-09-19 Perforation 377.30 378.00 3
1973-09-19 Fracture 315.20 378.00 0
1975-10-23 Perforation 292.30 293.20 7
1975-10-23 Perforation 298.40 299.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 1255 0.0 0.0 0.0
1974 8577 0.0 0.0 0.0
1975 8134 0.0 0.0 0.0
1976 8282 0.0 0.0 0.0
1977 8469 0.0 0.0 0.0
1978 7226 0.0 0.0 0.0
1979 7044 0.0 0.0 0.0
1980 8456 0.0 0.0 0.0
1981 8665 0.0 0.0 0.0
1982 5957 0.0 0.0 0.0
1983 5610 0.0 0.0 0.0
1984 8708 0.0 0.0 0.0
1985 8557 0.0 0.0 0.0
1986 6004 0.0 0.0 0.0
1987 6788 0.0 0.0 0.0
1988 8598 0.0 0.0 0.0
1989 8487 0.0 0.0 0.0
1990 7624 0.0 0.0 0.0
1991 8629 0.0 0.0 0.0
1992 8666 0.0 0.0 0.0
1993 6455 0.0 0.0 0.0
1994 8753 0.0 0.0 0.0
1995 8725 0.0 0.0 0.0
1996 8685 0.0 0.0 0.0
1997 8721 0.0 0.0 0.0
1998 3167 0.0 0.0 0.0

For data sources see[5]

References