X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164123006002

Well Details

Well ID: 0164123006002
Loading map...
Location: 00/06-30-016-12W4/2
Location Alias: 00/06-30-16-12 W4M
Location Alias 2: 00/06-30-016-12 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 30
County/Municipality: County of Newell
Well Name: CARDINAL BANTRY 6-30-16-12
Operator Name: Cardinal Energy Ltd.
License Number: 0044276
License Date: 1972-11-22
License Status: Suspension
Spud Date: 1972-11-22
Final Drill Date: 1972-11-25
Well Total Depth: 985.30 m
Surface Hole Latitude: 50.372277
Surface Hole Longitude: -111.645893

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-11-22 Obtained License
1972-11-25 Finished Drilling
1972-11-26 Production Casing Operation Performed
1972-11-30 Perforation Treatment Performed - Jet Perforation
1972-12-04 Perforation Treatment Performed - Fractured
1972-12-13 Perforation Treatment Performed - Jet Perforation
1973-02-12 Perforation Treatment Performed - Jet Perforation
1973-02-20 Well Mode changed to Drilled and Cased
1973-07-17 Perforation Treatment Performed - Cement Squeeze
1976-03-18 Well Began Production
1976-03-18 Well Fluid changed to Gas
1976-03-18 Well Mode changed to Flowing
1976-09-01 Well Fluid changed to Gas
1976-09-01 Well Mode changed to Suspended
1979-03-10 Well Fluid changed to Gas
1979-03-10 Well Mode changed to Flowing
1979-11-25 Perforation Treatment Performed - Cement Squeeze
1979-11-25 Well Fluid changed to Gas
1979-11-25 Well Mode changed to Abandoned Zone
1985-01-10 Well Log Performed
1985-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-11 Perforation Treatment Performed - Jet Perforation
1985-01-11 Perforation Treatment Performed - Open-Hole Completion
1985-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-15 Perforation Treatment Performed - Cement Squeeze
1988-06-15 Plug Back Performed
1989-02-13 Well Log Performed
1990-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-30 Perforation Treatment Performed - Cement Squeeze
1990-10-30 Perforation Treatment Performed - Jet Perforation
1990-11-01 Perforation Treatment Performed - Jet Perforation
1990-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-02 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-11-30 Perforation 847.30 849.50 7
1985-01-11 Acid Treatment 963.20 974.40 0
1985-01-14 Acid Treatment 963.20 974.40 0
1988-06-15 Cement Squeeze 847.30 849.50 0
1990-10-30 Perforation 775.40 777.20 7
1990-10-30 Acid Treatment 775.40 777.20 0
1990-10-30 Cement Squeeze 775.40 777.20 0
1990-11-01 Perforation 807.50 808.50 13
1990-11-02 Acid Treatment 807.50 808.50 0
1990-11-02 Cement Squeeze 807.50 808.50 0
1972-12-04 Fracture 847.30 849.50 0
1972-12-13 Perforation 806.80 809.50 7
1973-02-12 Perforation 775.40 777.20 7
1973-07-17 Cement Squeeze 775.40 777.20 0
1979-11-25 Cement Squeeze 806.80 809.50 0
1985-01-11 Open Hole/Barefoot Completion 975.00 985.00 0
1985-01-11 Perforation 969.60 974.40 13
1985-01-11 Perforation 963.20 966.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2312 0.0 0.0 0.0
1979 880 0.0 0.0 0.0

For data sources see[5]

References