If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164122306020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.35927,"lon":-111.554454,"icon":""}]} |
Location: 02/06-23-016-12W4/0 | |
Location Alias: 02/06-23-16-12 W4M | |
Location Alias 2: 02/06-23-016-12 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 12 | |
Section: 23 | |
County/Municipality: County of Newell | |
Well Name: CARDINAL ALDSON 6-23-16-12 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0119484 | |
License Date: 1985-11-20 | |
License Status: Issued | |
Spud Date: 1985-11-21 | |
Final Drill Date: 1985-11-26 | |
Well Total Depth: 992.00 m | |
Surface Hole Latitude: 50.359270 | |
Surface Hole Longitude: -111.554454 |
Date | Event |
---|---|
1985-11-20 | Obtained License |
1985-11-22 | Surface Casing Operation Performed |
1985-11-26 | Finished Drilling |
1985-11-26 | Well Log Performed |
1985-11-26 | Well Mode changed to Drilled and Cased |
1985-11-27 | Production Casing Operation Performed |
1985-11-28 | Rig Released |
1985-12-06 | Perforation Treatment Performed - Jet Perforation |
1985-12-06 | Well Began Production |
1985-12-06 | Well Fluid changed to Crude Oil |
1985-12-06 | Well Mode changed to Flowing |
1986-05-31 | Well Fluid changed to Crude Oil |
1986-05-31 | Well Mode changed to Suspended |
1986-06-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-06-02 | Perforation Treatment Performed - Jet Perforation |
1986-06-02 | Plug Back Performed |
1986-06-02 | Well Fluid changed to Crude Oil |
1986-06-02 | Well Mode changed to Abandoned Zone |
1997-08-19 | Perforation Treatment Performed - Jet Perforation |
1997-08-19 | Well Log Performed |
1997-08-20 | Perforation Treatment Performed - Fractured |
1997-08-24 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-12-06 | Perforation | 968.00 | 969.50 | 7 |
1986-06-02 | Packing Device Capped w/Cement | 960.20 | 966.20 | 0 |
1986-06-02 | Perforation | 950.00 | 954.50 | 12 |
1997-08-19 | Perforation | 950.00 | 954.50 | 13 |
1997-08-20 | Fracture | 950.00 | 954.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 297 | 0.0 | 0.0 | 0.0 |
1986 | 822 | 0.0 | 0.0 | 0.0 |
For data sources see[5]