X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164122303002

Well Details

Well ID: 0164122303002
Loading map...
Location: 00/03-23-016-12W4/2
Location Alias: 00/03-23-16-12 W4M
Location Alias 2: 00/03-23-016-12 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 23
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 3-23-16-12
Operator Name: Cardinal Energy Ltd.
License Number: 0038212
License Date: 1970-06-01
License Status: Suspension
Spud Date: 1970-06-05
Final Drill Date: 1970-06-13
Well Total Depth: 984.50 m
Surface Hole Latitude: 50.355912
Surface Hole Longitude: -111.554756

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-06-01 Obtained License
1970-06-12 Drill Stem Test Performed
1970-06-13 Drill Stem Test Performed
1970-06-13 Finished Drilling
1970-06-13 Well Mode changed to Drilled and Cased
1970-06-14 Drill Stem Test Performed
1970-06-15 Production Casing Operation Performed
1970-07-01 Perforation Treatment Performed - Jet Perforation
1970-07-02 Perforation Treatment Performed - Jet Perforation
1970-07-04 Perforation Treatment Performed - Cement Squeeze
1970-07-07 Perforation Treatment Performed - Jet Perforation
1970-07-12 Perforation Treatment Performed - Jet Perforation
1972-07-10 Well Began Production
1972-07-10 Well Fluid changed to Crude Oil
1972-07-10 Well Mode changed to Pumping
1973-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-05-16 Well Fluid changed to Crude Oil
1973-05-16 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-07-01 Perforation 967.10 967.70 7
1970-07-02 Perforation 967.10 968.00 7
1970-07-04 Cement Squeeze 967.10 968.00 0
1970-07-07 Perforation 967.40 967.70 3
1970-07-12 Perforation 947.90 949.80 7
1973-05-16 Packing Device Capped w/Cement 960.10 960.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 2498 0.0 0.0 0.0
1973 720 0.0 0.0 0.0

For data sources see[5]

References