X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164122303000

Well Details

Well ID: 0164122303000
Loading map...
Location: 00/03-23-016-12W4/0
Location Alias: 00/03-23-16-12 W4M
Location Alias 2: 00/03-23-016-12 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 23
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 3-23-16-12
Operator Name: Cardinal Energy Ltd.
License Number: 0038212
License Date: 1970-06-01
License Status: Suspension
Spud Date: 1970-06-05
Final Drill Date: 1970-06-13
Well Total Depth: 984.50 m
Surface Hole Latitude: 50.355912
Surface Hole Longitude: -111.554756

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-06-01 Obtained License
1970-06-12 Drill Stem Test Performed
1970-06-13 Drill Stem Test Performed
1970-06-13 Finished Drilling
1970-06-13 Well Mode changed to Drilled and Cased
1970-06-14 Drill Stem Test Performed
1970-06-15 Production Casing Operation Performed
1970-07-01 Perforation Treatment Performed - Jet Perforation
1970-07-02 Perforation Treatment Performed - Jet Perforation
1970-07-04 Perforation Treatment Performed - Cement Squeeze
1970-07-07 Perforation Treatment Performed - Jet Perforation
1970-07-12 Perforation Treatment Performed - Jet Perforation
1970-07-20 Well Began Production
1970-07-20 Well Fluid changed to Crude Oil
1970-07-20 Well Mode changed to Flowing
1972-07-10 Well Fluid changed to Crude Oil
1972-07-10 Well Mode changed to Flowing
1973-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-05-16 Well Fluid changed to Crude Oil
1973-05-16 Well Mode changed to Pumping
2016-03-01 Well Fluid changed to Crude Oil
2016-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-07-01 Perforation 967.10 967.70 7
1970-07-02 Perforation 967.10 968.00 7
1970-07-04 Cement Squeeze 967.10 968.00 0
1970-07-07 Perforation 967.40 967.70 3
1970-07-12 Perforation 947.90 949.80 7
1973-05-16 Packing Device Capped w/Cement 960.10 960.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 3334 0.0 0.0 0.0
1971 7019 0.0 0.0 0.0
1972 5048 0.0 0.0 0.0
1973 5702 0.0 0.0 0.0
1974 6568 0.0 0.0 0.0
1975 8184 0.0 0.0 0.0
1976 7204 0.0 0.0 0.0
1977 8125 0.0 0.0 0.0
1978 8082 0.0 0.0 0.0
1979 7777 0.0 0.0 0.0
1980 4339 0.0 0.0 0.0
1981 8489 0.0 0.0 0.0
1982 6388 0.0 0.0 0.0
1983 8040 0.0 0.0 0.0
1984 8685 0.0 0.0 0.0
1985 7290 0.0 0.0 0.0
1986 7126 0.0 0.0 0.0
1987 7648 0.0 0.0 0.0
1988 8731 0.0 0.0 0.0
1989 8512 0.0 0.0 0.0
1990 8733 0.0 0.0 0.0
1991 8429 0.0 0.0 0.0
1992 8766 0.0 0.0 0.0
1993 8729 0.0 0.0 0.0
1994 8715 0.0 0.0 0.0
1995 8706 0.0 0.0 0.0
1996 8606 0.0 0.0 0.0
1997 8510 0.0 0.0 0.0
1998 8698 0.0 0.0 0.0
1999 8568 0.0 0.0 0.0
2000 8653 0.0 0.0 0.0
2001 8392 0.0 0.0 0.0
2002 8646 0.0 0.0 0.0
2003 8086 0.0 0.0 0.0
2004 7664 0.0 0.0 0.0
2005 8269 0.0 0.0 0.0
2006 8518 0.0 0.0 0.0
2007 7585 0.0 0.0 0.0
2008 8469 0.0 0.0 0.0
2009 7591 0.0 0.0 0.0
2010 8431 0.0 0.0 0.0
2011 6606 0.0 0.0 0.0
2012 8757 0.0 0.0 0.0
2013 8498 0.0 0.0 0.0
2014 8472 0.0 0.0 0.0

For data sources see[5]

References