X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164122214000

Well Details

Well ID: 0164122214000
Loading map...
Location: 00/14-22-016-12W4/0
Location Alias: 00/14-22-16-12 W4M
Location Alias 2: 00/14-22-016-12 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 22
County/Municipality: County of Newell
Well Name: CARDINAL HZ BANTRY 14-22-16-12
Operator Name: Cardinal Energy Ltd.
License Number: 0475089
License Date: 2015-03-30
License Status: Issued
Spud Date: 2015-04-30
Final Drill Date: 2015-05-07
Well Total Depth: 2298.00 m
Surface Hole Latitude: 50.379550
Surface Hole Longitude: -111.576816

For data sources see[1][2]

Well History

Date Event
2015-03-30 Obtained License
2015-05-01 Surface Casing Operation Performed
2015-05-02 Direction Drilling Operation Performed - Deviate
2015-05-03 Direction Drilling Operation Performed - Horizontal
2015-05-04 Intermediate Casing Operation Performed
2015-05-07 Finished Drilling
2015-05-07 Well Log Performed
2015-05-07 Well Mode changed to Drilled and Cased
2015-05-08 Liner Casing Operation Performed
2015-05-08 Perforation Treatment Performed - Open-Hole Completion
2015-05-08 Rig Released
2015-05-20 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-20 Well Began Production
2015-05-20 Well Fluid changed to Crude Oil
2015-05-20 Well Mode changed to Flowing
2018-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-04-30 Bonanza Drilling Inc. 4 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-05-02 690.00 Deviate (5 - 79 degrees)
2015-05-03 1048.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-05-08 Open Hole/Barefoot Completion 2048.00 2298.00 0
2015-05-20 Multi-Stage Fracture 1415.10 1415.90 0
2015-05-20 Multi-Stage Fracture 1343.60 1344.50 0
2015-05-20 Multi-Stage Fracture 1272.10 1273.00 0
2015-05-20 Multi-Stage Fracture 1200.50 1201.30 0
2015-05-20 Multi-Stage Fracture 1129.20 1130.00 0
2018-10-01 Acid Treatment 1129.20 2298.00 0
2019-09-26 Acid Treatment 1129.20 2016.10 0
2015-05-20 Multi-Stage Fracture 2014.80 2016.10 0
2015-05-20 Multi-Stage Fracture 1941.30 1942.20 0
2015-05-20 Multi-Stage Fracture 1869.80 1870.70 0
2015-05-20 Multi-Stage Fracture 1798.30 1799.10 0
2015-05-20 Multi-Stage Fracture 1714.60 1715.40 0
2015-05-20 Multi-Stage Fracture 1642.40 1643.20 0
2015-05-20 Multi-Stage Fracture 1570.10 1571.00 0
2015-05-20 Multi-Stage Fracture 1498.50 1499.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-05-20 2015-05-20 933 910 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 62.8945 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 28.2052 N/A
Crystalline silica. quartz 14808-60-7 100 28.2052 N/A
Iron Oxide 1309-37-1 100 28.2052 N/A
Titanium Oxide 13463-67-7 100 28.2052 N/A
Yukon Black (16/30) Canyon Crystalline silica. quartz 14808-60-7 100 4.4176 N/A
Furfuryl Alcohol 98-00-0 100 4.4176 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0163 N/A
Water 7732-18-5 100 0.0163 N/A
CAN-2300 Breaker (Enzyme HpH. 10L:1L) Canyon Breaker Cellulase Enzyme Solution Not Available 100 0.0041 N/A
Water 7732-18-5 100 0.0041 N/A
CAN-2301 Breaker (Oxidizer) Canyon Breaker Ammonium Persulfate 7727-54-0 100 0.0466 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0466 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1048 N/A
Water 7732-18-5 100 0.1048 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Crosslinker Boric Acid 10043-35-3 100 0.1735 N/A
Monoethanolamine 141-43-5 100 0.1735 N/A
Water 7732-18-5 100 0.1735 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 3.7359 N/A
Non-hazardous base ingredient(s) Not Available 100 3.736 N/A
CAN-2000 Gellant (Guar) Canyon Gelling Agent Polysacharide Suspension Not Available 100 0.3376 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0633 N/A
Methanol 67-56-1 100 0.0633 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0633 N/A
Water 7732-18-5 100 0.0633 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-05-14 2015-05-16 Municipal Water 1229

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 5290 0.0 0.0 0.0
2016 8400 0.0 0.0 0.0
2017 8645 0.0 0.0 0.0
2018 8511 0.0 0.0 0.0
2019 7960 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-08 No Incident Encountered 0.00 0.00
2018-10-01 No Incident Encountered 0.00 0.00
2019-09-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References