X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164121516040

Well Details

Well ID: 0164121516040
Loading map...
Location: 04/16-15-016-12W4/0
Location Alias: 04/16-15-16-12 W4M
Location Alias 2: 04/16-15-016-12 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 15
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 16-15-16-12
Operator Name: Cardinal Energy Ltd.
License Number: 0180320
License Date: 1995-08-28
License Status: Issued
Spud Date: 1995-09-08
Final Drill Date: 1995-09-11
Well Total Depth: 1015.00 m
Surface Hole Latitude: 50.352560
Surface Hole Longitude: -111.565835

For data sources see[1][2]

Well History

Date Event
1995-08-28 Obtained License
1995-09-08 Surface Casing Operation Performed
1995-09-09 Direction Drilling Operation Performed - Deviate
1995-09-11 Finished Drilling
1995-09-11 Well Mode changed to Drilled and Cased
1995-09-12 Production Casing Operation Performed
1995-09-12 Rig Released
1995-09-12 Well Log Performed
1995-09-20 Perforation Treatment Performed - Jet Perforation
1995-09-21 Perforation Treatment Performed - Jet Perforation
1995-09-22 Perforation Treatment Performed - Cement Squeeze
1995-09-22 Perforation Treatment Performed - Jet Perforation
1995-09-25 Perforation Treatment Performed - Jet Perforation
1995-10-11 Well Log Performed
1996-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-16 Perforation Treatment Performed - Jet Perforation
1996-10-16 Plug Back Performed
1996-10-23 Well Began Production
1996-10-23 Well Fluid changed to Crude Oil
1996-10-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-09-09 294.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-20 Perforation 993.00 995.00 13
1995-09-21 Perforation 974.00 976.00 13
1995-09-22 Perforation 979.00 980.00 13
1995-09-22 Cement Squeeze 974.00 980.00 0
1995-09-25 Perforation 974.00 975.00 13
1996-10-16 Packing Device Capped w/Cement 987.00 990.00 0
1996-10-16 Perforation 975.00 978.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1380 0.0 0.0 0.0
1997 3500 0.0 0.0 0.0
1998 8186 0.0 0.0 0.0
1999 8595 0.0 0.0 0.0
2000 8429 0.0 0.0 0.0
2001 8359 0.0 0.0 0.0
2002 8595 0.0 0.0 0.0
2003 8260 0.0 0.0 0.0
2004 8247 0.0 0.0 0.0
2005 7291 0.0 0.0 0.0
2006 7109 0.0 0.0 0.0
2007 7995 0.0 0.0 0.0
2008 8452 0.0 0.0 0.0
2009 8559 0.0 0.0 0.0
2010 8522 0.0 0.0 0.0
2011 8618 0.0 0.0 0.0
2012 8728 0.0 0.0 0.0
2013 8340 0.0 0.0 0.0
2014 8743 0.0 0.0 0.0
2015 8669 0.0 0.0 0.0
2016 8550 0.0 0.0 0.0
2017 8664 0.0 0.0 0.0
2018 8633 0.0 0.0 0.0
2019 8414 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[6]

References