X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164121413000

Well Details

Well ID: 0164121413000
Loading map...
Location: 00/13-14-016-12W4/0
Location Alias: 00/13-14-16-12 W4M
Location Alias 2: 00/13-14-016-12 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 14
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 13-14-16-12
Operator Name: Cardinal Energy Ltd.
License Number: 0040102
License Date: 1971-05-18
License Status: Abandoned
Spud Date: 1971-06-12
Final Drill Date: 1971-06-17
Well Total Depth: 1008.90 m
Surface Hole Latitude: 50.351660
Surface Hole Longitude: -111.559528

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-05-18 Obtained License
1971-06-17 Drill Stem Test Performed
1971-06-17 Finished Drilling
1971-06-17 Well Mode changed to Drilled and Cased
1971-06-18 Drill Stem Test Performed
1971-06-19 Production Casing Operation Performed
1971-06-28 Perforation Treatment Performed - Cement Squeeze
1971-06-28 Perforation Treatment Performed - Jet Perforation
1971-06-29 Perforation Treatment Performed - Cement Squeeze
1971-07-01 Perforation Treatment Performed - Jet Perforation
1971-07-02 Perforation Treatment Performed - Visqueeze
1971-07-03 Perforation Treatment Performed - Fractured
1971-07-21 Well Began Production
1971-07-21 Well Fluid changed to Crude Oil
1971-07-21 Well Mode changed to Pumping
1971-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-11-17 Perforation Treatment Performed - Jet Perforation
1972-03-13 Well Fluid changed to Crude Oil
1972-03-13 Well Mode changed to Pumping
1987-09-08 Well Fluid changed to Crude Oil
1987-09-08 Well Mode changed to Suspended
1989-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-20 Perforation Treatment Performed - Cement Squeeze
1994-06-20 Plug Back Performed
1994-06-20 Well Fluid changed to Crude Oil
1994-06-20 Well Mode changed to Abandoned Zone
1994-06-25 Perforation Treatment Performed - Jet Perforation
1996-10-18 Perforation Treatment Performed - Jet Perforation
1996-10-18 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
1996-10-18 Plug Back Performed
1996-10-19 Perforation Treatment Performed - Fractured
1996-10-24 Well Fluid changed to Crude Oil
1996-10-24 Well Mode changed to Pumping
1999-10-25 Well Fluid changed to Crude Oil
1999-10-25 Well Mode changed to Suspended
2000-05-10 Well Fluid changed to Crude Oil
2000-05-10 Well Mode changed to Pumping
2008-08-02 Well Fluid changed to Crude Oil
2008-08-02 Well Mode changed to Suspended
2018-07-06 Well Log Performed
2018-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-23 Plug Back Performed
2018-07-23 Well Fluid changed to Crude Oil
2018-07-23 Well Log Performed
2018-07-23 Well Mode changed to Abandoned Zone
2018-09-07 Perforation Treatment Performed - Jet Perforation
2018-09-07 Well Log Performed
2018-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-09-08 Perforation Treatment Performed - Cement Squeeze
2018-10-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-06-28 Perforation 970.50 971.10 7
1989-01-23 Acid Treatment 980.80 983.30 0
1994-06-20 Cement Squeeze 956.80 959.50 0
1994-06-25 Perforation 976.00 983.00 17
1996-10-18 Packing Dev Cpd w/Res-Gyp Cem 965.00 968.00 0
1996-10-18 Perforation 956.80 959.50 13
1996-10-19 Fracture 956.80 959.50 0
2018-07-23 Packing Device Capped w/Cement 938.00 946.00 0
2018-09-07 Perforation 249.00 250.00 20
2018-09-08 Cement Squeeze 249.00 250.00 0
2018-09-08 Packing Device Capped w/Cement 122.00 130.00 0
1971-06-28 Cement Squeeze 970.50 971.10 0
1971-06-28 Perforation 970.50 971.10 7
1971-06-29 Cement Squeeze 970.50 971.10 0
1971-07-01 Perforation 956.80 959.50 7
1971-07-02 Visqueeze 956.80 959.50 0
1971-07-03 Fracture 956.80 959.50 0
1971-11-17 Perforation 980.80 983.30 13
1971-11-17 Acid Treatment 980.80 983.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 2601 0.0 0.0 0.0
1972 6312 0.0 0.0 0.0
1973 8595 0.0 0.0 0.0
1974 7128 0.0 0.0 0.0
1975 7584 0.0 0.0 0.0
1976 7642 0.0 0.0 0.0
1977 8602 0.0 0.0 0.0
1978 7908 0.0 0.0 0.0
1979 6916 0.0 0.0 0.0
1980 4307 0.0 0.0 0.0
1981 8657 0.0 0.0 0.0
1982 6648 0.0 0.0 0.0
1983 8567 0.0 0.0 0.0
1984 8757 0.0 0.0 0.0
1985 8682 0.0 0.0 0.0
1986 6765 0.0 0.0 0.0
1987 2660 0.0 0.0 0.0
1996 572 0.0 0.0 0.0
1997 5879 0.0 0.0 0.0
1998 8107 0.0 0.0 0.0
1999 3233 0.0 0.0 0.0
2000 5324 0.0 0.0 0.0
2001 5019 0.0 0.0 0.0
2002 1008 0.0 0.0 0.0
2003 216 0.0 0.0 0.0
2005 720 0.0 0.0 0.0
2006 3770 0.0 0.0 0.0
2008 344 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-23 No Incident Encountered 0.00 0.00
2018-09-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References