X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164120506022

Well Details

Well ID: 0164120506022
Loading map...
Location: 02/06-05-016-12W4/2
Location Alias: 02/06-05-16-12 W4M
Location Alias 2: 02/06-05-016-12 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 05
County/Municipality: County of Newell
Well Name: ARC ALDSON 6-5-16-12
Operator Name: ARC Resources Ltd.
License Number: 0048264
License Date: 1973-12-07
License Status: RecCertified
Spud Date: 1973-12-19
Final Drill Date: 1974-01-02
Well Total Depth: 837.00 m
Surface Hole Latitude: 50.313894
Surface Hole Longitude: -111.625322

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-12-07 Obtained License
1973-12-31 Blow Occurred
1973-12-31 Lost Circulation Occurred
1974-01-02 Finished Drilling
1974-01-02 Well Mode changed to Drilled and Cased
1974-01-04 Drill Stem Test Performed
1974-01-06 Production Casing Operation Performed
1974-03-17 Perforation Treatment Performed - Jet Perforation
1975-06-05 Perforation Treatment Performed - Cement Squeeze
1975-06-06 Perforation Treatment Performed - Cement Squeeze
1975-06-09 Perforation Treatment Performed - Jet Perforation
1975-06-10 Perforation Treatment Performed - Jet Perforation
1975-06-11 Perforation Treatment Performed - Acid Wash - No Pressure
1977-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-06-21 Perforation Treatment Performed - Fractured
1977-06-21 Perforation Treatment Performed - Jet Perforation
1977-06-21 Perforation Treatment Performed - Selective Jet Perforations
1977-09-09 Well Began Production
1977-09-09 Well Fluid changed to Gas
1977-09-09 Well Mode changed to Flowing
1995-12-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-28 Plug Back Performed
1995-12-28 Well Abandoned
1995-12-28 Well Fluid changed to Gas
1995-12-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-03-17 Perforation 770.80 771.80 7
1977-06-21 Selective Jet Perforations 314.20 314.90 0
1977-06-21 Selective Jet Perforations 315.50 331.90 0
1977-06-21 Selective Jet Perforations 332.50 333.10 0
1977-06-21 Selective Jet Perforations 333.80 334.40 0
1977-06-21 Selective Jet Perforations 343.20 343.80 0
1977-06-21 Selective Jet Perforations 344.70 345.30 0
1977-06-21 Selective Jet Perforations 345.90 345.90 0
1977-06-21 Fracture 300.20 345.90 0
1995-12-28 Packing Device Capped w/Cement 294.00 302.00 0
1975-06-05 Cement Squeeze 770.80 771.80 0
1975-06-06 Cement Squeeze 770.80 771.80 0
1975-06-09 Perforation 770.50 771.10 7
1975-06-10 Perforation 771.10 771.80 7
1975-06-11 Acid Wash 770.50 771.80 0
1977-06-20 Packing Device Capped w/Cement 693.40 701.00 0
1977-06-21 Perforation 300.20 301.40 3
1977-06-21 Selective Jet Perforations 307.50 308.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 2585 0.0 0.0 0.0
1978 7528 0.0 0.0 0.0
1979 5407 0.0 0.0 0.0
1980 8323 0.0 0.0 0.0
1981 7771 0.0 0.0 0.0
1982 5432 0.0 0.0 0.0
1983 4362 0.0 0.0 0.0
1984 8399 0.0 0.0 0.0
1985 6778 0.0 0.0 0.0
1986 6866 0.0 0.0 0.0
1987 6359 0.0 0.0 0.0
1988 7582 0.0 0.0 0.0
1989 5540 0.0 0.0 0.0
1990 3784 0.0 0.0 0.0
1991 3748 0.0 0.0 0.0
1992 8284 0.0 0.0 0.0
1993 8592 0.0 0.0 0.0
1994 7716 0.0 0.0 0.0
1995 7217 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1973-12-31 Blow 792.00 792.00
1973-12-31 Lost Circulation 791.90 791.90

For data sources see[6]

References