If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164110907000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.328228,"lon":-111.454048,"icon":""}]} |
Location: 00/07-09-016-11W4/0 | |
Location Alias: 00/07-09-16-11 W4M | |
Location Alias 2: 00/07-09-016-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 11 | |
Section: 09 | |
County/Municipality: County of Newell | |
Well Name: CNRL ALDERSON 7-9-16-11 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0042668 | |
License Date: 1972-06-05 | |
License Status: Abandoned | |
Spud Date: 1972-06-06 | |
Final Drill Date: 1972-06-07 | |
Well Total Depth: 382.50 m | |
Surface Hole Latitude: 50.328228 | |
Surface Hole Longitude: -111.454048 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-06-05 | Obtained License |
1972-06-07 | Finished Drilling |
1972-06-07 | Production Casing Operation Performed |
1972-06-08 | Well Mode changed to Drilled and Cased |
1972-06-20 | Perforation Treatment Performed - Selective Bullet Perforations |
1972-06-21 | Perforation Treatment Performed - Fractured |
1972-10-14 | Well Began Production |
1972-10-14 | Well Fluid changed to Gas |
1972-10-14 | Well Mode changed to Flowing |
1972-10-31 | Perforation Treatment Performed - Fractured |
2006-06-02 | Well Log Performed |
2011-08-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-03 | Plug Back Performed |
2011-08-03 | Well Fluid changed to Gas |
2011-08-03 | Well Mode changed to Abandoned Zone |
2011-08-21 | Well Abandoned |
2011-08-21 | Well Fluid changed to Gas |
2011-08-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-06-20 | Selective Bullet Perforations | 290.80 | 290.80 | 0 |
1972-06-20 | Selective Bullet Perforations | 306.60 | 306.60 | 0 |
1972-06-20 | Selective Bullet Perforations | 322.80 | 322.80 | 0 |
1972-06-20 | Selective Bullet Perforations | 323.10 | 323.10 | 0 |
1972-06-20 | Selective Bullet Perforations | 324.60 | 324.60 | 0 |
1972-06-20 | Selective Bullet Perforations | 324.90 | 324.90 | 0 |
1972-06-20 | Selective Bullet Perforations | 325.20 | 325.20 | 0 |
1972-06-20 | Selective Bullet Perforations | 325.50 | 325.50 | 0 |
1972-06-20 | Selective Bullet Perforations | 337.70 | 337.70 | 0 |
1972-06-20 | Selective Bullet Perforations | 338.30 | 338.30 | 0 |
1972-06-20 | Selective Bullet Perforations | 341.70 | 341.70 | 0 |
1972-06-20 | Selective Bullet Perforations | 293.80 | 293.80 | 0 |
1972-06-20 | Selective Bullet Perforations | 342.00 | 342.00 | 0 |
1972-06-20 | Selective Bullet Perforations | 342.30 | 342.30 | 0 |
1972-06-20 | Selective Bullet Perforations | 342.60 | 342.60 | 0 |
1972-06-20 | Selective Bullet Perforations | 354.20 | 354.20 | 0 |
1972-06-20 | Selective Bullet Perforations | 356.00 | 356.00 | 0 |
1972-06-20 | Selective Bullet Perforations | 356.60 | 356.60 | 0 |
1972-06-21 | Fracture | 290.80 | 356.60 | 0 |
1972-10-31 | Fracture | 290.80 | 356.60 | 0 |
2011-08-03 | Packing Device Capped w/Cement | 272.00 | 280.00 | 0 |
1972-06-20 | Selective Bullet Perforations | 294.10 | 294.10 | 0 |
1972-06-20 | Selective Bullet Perforations | 296.90 | 296.90 | 0 |
1972-06-20 | Selective Bullet Perforations | 300.80 | 300.80 | 0 |
1972-06-20 | Selective Bullet Perforations | 301.80 | 301.80 | 0 |
1972-06-20 | Selective Bullet Perforations | 305.70 | 305.70 | 0 |
1972-06-20 | Selective Bullet Perforations | 306.00 | 306.00 | 0 |
1972-06-20 | Selective Bullet Perforations | 306.30 | 306.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1972 | 1535 | 0.0 | 0.0 | 0.0 |
1973 | 8559 | 0.0 | 0.0 | 0.0 |
1974 | 8242 | 0.0 | 0.0 | 0.0 |
1975 | 8654 | 0.0 | 0.0 | 0.0 |
1976 | 8552 | 0.0 | 0.0 | 0.0 |
1977 | 8590 | 0.0 | 0.0 | 0.0 |
1978 | 7820 | 0.0 | 0.0 | 0.0 |
1979 | 7551 | 0.0 | 0.0 | 0.0 |
1980 | 8456 | 0.0 | 0.0 | 0.0 |
1981 | 7022 | 0.0 | 0.0 | 0.0 |
1982 | 7093 | 0.0 | 0.0 | 0.0 |
1983 | 7609 | 0.0 | 0.0 | 0.0 |
1984 | 8343 | 0.0 | 0.0 | 0.0 |
1985 | 8193 | 0.0 | 0.0 | 0.0 |
1986 | 6193 | 0.0 | 0.0 | 0.0 |
1987 | 6961 | 0.0 | 0.0 | 0.0 |
1988 | 8460 | 0.0 | 0.0 | 0.0 |
1989 | 8545 | 0.0 | 0.0 | 0.0 |
1990 | 8468 | 0.0 | 0.0 | 0.0 |
1991 | 8129 | 0.0 | 0.0 | 0.0 |
1992 | 8628 | 0.0 | 0.0 | 0.0 |
1993 | 8686 | 0.0 | 0.0 | 0.0 |
1994 | 8013 | 0.0 | 0.0 | 0.0 |
1995 | 8702 | 0.0 | 0.0 | 0.0 |
1996 | 8644 | 0.0 | 0.0 | 0.0 |
1997 | 8726 | 0.0 | 0.0 | 0.0 |
1998 | 8609 | 0.0 | 0.0 | 0.0 |
1999 | 8726 | 0.0 | 0.0 | 0.0 |
2000 | 8781 | 0.0 | 0.0 | 0.0 |
2001 | 8704 | 0.0 | 0.0 | 0.0 |
2002 | 8752 | 0.0 | 0.0 | 0.0 |
2003 | 8757 | 0.0 | 0.0 | 0.0 |
2004 | 8783 | 0.0 | 0.0 | 0.0 |
2005 | 8759 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 7271 | 0.0 | 0.0 | 0.0 |
2008 | 8779 | 0.0 | 0.0 | 0.0 |
2009 | 6502 | 0.0 | 0.0 | 0.0 |
2010 | 8006 | 0.0 | 0.0 | 0.0 |
2011 | 4835 | 0.0 | 0.0 | 0.0 |
For data sources see[5]