X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164103106000

Well Details

Well ID: 0164103106000
Loading map...
Location: 00/06-31-016-10W4/0
Location Alias: 00/06-31-16-10 W4M
Location Alias 2: 00/06-31-016-10 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 10
Section: 31
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 6-31-16-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0051790
License Date: 1974-11-07
License Status: Issued
Spud Date: 1974-11-14
Final Drill Date: 1974-11-16
Well Total Depth: 670.60 m
Surface Hole Latitude: 50.389576
Surface Hole Longitude: -111.368442

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-11-07 Obtained License
1974-11-16 Finished Drilling
1974-11-16 Production Casing Operation Performed
1974-11-16 Well Mode changed to Drilled and Cased
1974-12-09 Perforation Treatment Performed - Fractured
1974-12-09 Perforation Treatment Performed - Jet Perforation
1975-03-20 Well Began Production
1975-03-20 Well Fluid changed to Gas
1975-03-20 Well Mode changed to Flowing
1975-09-09 Perforation Treatment Performed - Fractured
1975-09-09 Perforation Treatment Performed - Jet Perforation
1975-09-09 Well Fluid changed to Gas
1975-09-09 Well Mode changed to Flowing
1975-09-11 Perforation Treatment Performed - Jet Perforation
1975-09-12 Perforation Treatment Performed - Fractured
1991-12-01 Well Fluid changed to Gas
1991-12-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-12-09 Perforation 611.40 613.30 13
1975-09-11 Perforation 350.80 352.00 7
1975-09-11 Perforation 357.50 358.40 7
1975-09-12 Fracture 293.20 358.40 0
1974-12-09 Fracture 611.40 613.30 0
1975-09-09 Perforation 407.80 409.00 13
1975-09-09 Perforation 413.60 414.80 13
1975-09-09 Fracture 407.80 414.80 0
1975-09-11 Perforation 293.20 296.30 3
1975-09-11 Perforation 304.20 306.00 7
1975-09-11 Perforation 345.60 346.60 7
1975-09-11 Perforation 325.50 326.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 5738 0.0 0.0 0.0
1976 8459 0.0 0.0 0.0
1977 6027 0.0 0.0 0.0
1978 6459 0.0 0.0 0.0
1979 6938 0.0 0.0 0.0
1980 8218 0.0 0.0 0.0
1981 3636 0.0 0.0 0.0
1982 3230 0.0 0.0 0.0
1983 2445 0.0 0.0 0.0
1984 3484 0.0 0.0 0.0
1985 5119 0.0 0.0 0.0
1986 1691 0.0 0.0 0.0
1987 3470 0.0 0.0 0.0
1988 6988 0.0 0.0 0.0
1989 7097 0.0 0.0 0.0
1990 7861 0.0 0.0 0.0
1991 5273 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8747 0.0 0.0 0.0
1994 8755 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8595 0.0 0.0 0.0
2001 8493 0.0 0.0 0.0
2002 8716 0.0 0.0 0.0
2003 8678 0.0 0.0 0.0
2004 8638 0.0 0.0 0.0
2005 8753 0.0 0.0 0.0
2006 8637 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References