If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164080612033 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.316447,"lon":-111.109324,"icon":""}]} |
Location: 03/12-06-016-08W4/3 | |
Location Alias: 03/12-06-16-08 W4M | |
Location Alias 2: 03/12-06-016-08 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 08 | |
Section: 06 | |
County/Municipality: Cypress County | |
Well Name: HARVEST 8A-1 SUFF 12-6-16-8 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0265884 | |
License Date: 2002-01-11 | |
License Status: Amended | |
Spud Date: 2002-04-18 | |
Final Drill Date: 2002-04-25 | |
Well Total Depth: 1421.00 m | |
Surface Hole Latitude: 50.316447 | |
Surface Hole Longitude: -111.109324 |
Date | Event |
---|---|
2002-01-11 | Obtained License |
2002-04-18 | Surface Casing Operation Performed |
2002-04-20 | Direction Drilling Operation Performed - Horizontal |
2002-04-21 | Intermediate Casing Operation Performed |
2002-04-23 | Direction Drilling Operation Performed - Horizontal |
2002-04-24 | Direction Drilling Operation Performed - Horizontal |
2002-04-25 | Finished Drilling |
2002-04-25 | Perforation Treatment Performed - Open-Hole Completion |
2002-04-25 | Rig Released |
2002-04-25 | Well Structure changed to Drain |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2002-04-20 | 741.00 | Horizontal |
2002-04-23 | 1064.00 | Horizontal |
2002-04-24 | 1153.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-04-25 | Open Hole/Barefoot Completion | 1041.00 | 1421.00 | 0 |
For data sources see[5]