X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164070206000

Well Details

Well ID: 0164070206000
Loading map...
Location: 00/06-02-016-07W4/0
Location Alias: 00/06-02-16-07 W4M
Location Alias 2: 00/06-02-016-07 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 07
Section: 02
County/Municipality: Cypress County
Well Name: CVE SUFFIELD 6-2-16-7
Operator Name: Ipc Canada Ltd.
License Number: 0065057
License Date: 1977-08-02
License Status: Issued
Spud Date: 1977-08-06
Final Drill Date: 1977-08-07
Well Total Depth: 580.90 m
Surface Hole Latitude: 50.313797
Surface Hole Longitude: -110.869083

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-08-02 Obtained License
1977-08-07 Finished Drilling
1977-08-07 Production Casing Operation Performed
1977-08-07 Well Mode changed to Drilled and Cased
1977-10-17 Perforation Treatment Performed - Jet Perforation
1977-10-19 Perforation Treatment Performed - Jet Perforation
1977-10-21 Perforation Treatment Performed - Fractured
1977-10-28 Perforation Treatment Performed - Jet Perforation
1977-11-05 Perforation Treatment Performed - Fractured
1978-02-04 Well Began Production
1978-02-04 Well Fluid changed to Gas
1978-02-04 Well Mode changed to Flowing
2000-06-05 Perforation Treatment Performed - Jet Perforation
2000-09-01 Well Fluid changed to Gas
2000-09-01 Well Mode changed to Flowing
2000-09-02 Well Fluid changed to Gas
2000-09-02 Well Mode changed to Flowing
2000-09-03 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-10-17 Perforation 557.80 559.60 13
2000-06-05 Perforation 289.00 291.00 7
2000-06-05 Perforation 332.20 335.20 7
2000-06-05 Perforation 382.20 386.20 7
2000-06-05 Perforation 406.60 408.60 7
2000-06-05 Perforation 450.20 452.20 7
2000-06-05 Perforation 503.80 505.80 7
2000-09-03 Fracture 289.00 291.00 0
2000-09-03 Fracture 332.20 335.20 0
2000-09-03 Fracture 382.20 386.20 0
2000-09-03 Fracture 406.60 408.60 0
1977-10-19 Perforation 557.80 559.60 10
2000-09-03 Fracture 450.20 452.20 0
2000-09-03 Fracture 503.80 505.80 0
1977-10-21 Fracture 557.80 559.60 0
1977-10-28 Perforation 274.00 275.20 3
1977-10-28 Perforation 289.30 290.20 3
1977-10-28 Perforation 314.20 317.60 3
1977-10-28 Perforation 321.30 321.60 3
1977-10-28 Perforation 325.50 326.10 3
1977-11-05 Fracture 274.00 326.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 96 0.0 0.0 0.0
1978 7075 0.0 0.0 0.0
1979 7414 0.0 0.0 0.0
1980 7908 0.0 0.0 0.0
1981 8048 0.0 0.0 0.0
1982 8640 0.0 0.0 0.0
1983 8577 0.0 0.0 0.0
1984 8780 0.0 0.0 0.0
1985 8565 0.0 0.0 0.0
1986 8736 0.0 0.0 0.0
1987 8733 0.0 0.0 0.0
1988 8777 0.0 0.0 0.0
1989 8755 0.0 0.0 0.0
1990 8681 0.0 0.0 0.0
1991 8658 0.0 0.0 0.0
1992 8735 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8635 0.0 0.0 0.0
2016 8549 0.0 0.0 0.0
2017 8551 0.0 0.0 0.0
2018 8452 0.0 0.0 0.0
2019 8623 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References