X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164062614000

Well Details

Well ID: 0164062614000
Loading map...
Location: 00/14-26-016-06W4/0
Location Alias: 00/14-26-16-06 W4M
Location Alias 2: 00/14-26-016-06 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 06
Section: 26
County/Municipality: Cypress County
Well Name: CVE SUFFIELD 14-26-16-6
Operator Name: Ipc Canada Ltd.
License Number: 0121363
License Date: 1986-01-14
License Status: Issued
Spud Date: 1986-01-23
Final Drill Date: 1986-01-24
Well Total Depth: 464.00 m
Surface Hole Latitude: 50.379927
Surface Hole Longitude: -110.730633

For data sources see[1][2]

Well History

Date Event
1986-01-14 Obtained License
1986-01-23 Surface Casing Operation Performed
1986-01-24 Finished Drilling
1986-01-24 Production Casing Operation Performed
1986-01-24 Rig Released
1986-01-24 Well Mode changed to Drilled and Cased
1986-01-29 Well Log Performed
1986-02-02 Perforation Treatment Performed - Jet Perforation
1986-02-02 Well Log Performed
1986-02-07 Perforation Treatment Performed - Fractured
1986-02-12 Perforation Treatment Performed - Jet Perforation
1986-02-12 Well Log Performed
1986-02-16 Perforation Treatment Performed - Fractured
1986-02-22 Perforation Treatment Performed - Jet Perforation
1986-02-22 Well Log Performed
1986-02-28 Perforation Treatment Performed - Fractured
1986-07-07 Well Began Production
1986-07-07 Well Fluid changed to Gas
1986-07-07 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-02 Perforation 384.00 387.00 7
1986-02-16 Fracture 323.00 348.50 0
1986-02-22 Perforation 284.00 286.00 3
1986-02-22 Perforation 287.50 292.50 3
1986-02-22 Perforation 294.00 298.00 3
1986-02-22 Perforation 299.00 302.00 3
1986-02-22 Perforation 303.00 305.00 3
1986-02-22 Perforation 306.50 308.50 3
1986-02-28 Fracture 284.00 308.50 0
1986-02-02 Perforation 389.40 391.40 3
1986-02-02 Perforation 394.40 397.40 3
1986-02-07 Fracture 384.00 397.40 0
1986-02-12 Perforation 323.00 326.00 3
1986-02-12 Perforation 326.00 330.00 3
1986-02-12 Perforation 332.00 336.00 3
1986-02-12 Perforation 337.50 340.50 3
1986-02-12 Perforation 343.00 348.50 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 5180 0.0 0.0 0.0
1987 8731 0.0 0.0 0.0
1988 8782 0.0 0.0 0.0
1989 8758 0.0 0.0 0.0
1990 8711 0.0 0.0 0.0
1991 8713 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8563 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8523 0.0 0.0 0.0
2010 7295 0.0 0.0 0.0
2011 3408 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8634 0.0 0.0 0.0
2016 8389 0.0 0.0 0.0
2017 8713 0.0 0.0 0.0
2018 8452 0.0 0.0 0.0
2019 8739 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References