X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164061008002

Well Details

Well ID: 0164061008002
Loading map...
Location: 00/08-10-016-06W4/2
Location Alias: 00/08-10-16-06 W4M
Location Alias 2: 00/08-10-016-06 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 06
Section: 10
County/Municipality: Cypress County
Well Name: CVE SUFFIELD 8-10-16-6
Operator Name: Ipc Canada Ltd.
License Number: 0098402
License Date: 1982-11-02
License Status: Issued
Spud Date: 1982-11-08
Final Drill Date: 1982-11-09
Well Total Depth: 450.00 m
Surface Hole Latitude: 50.328326
Surface Hole Longitude: -110.741565

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-02 Obtained License
1982-11-09 Finished Drilling
1982-11-09 Production Casing Operation Performed
1982-11-09 Well Mode changed to Drilled and Cased
1983-09-21 Perforation Treatment Performed - Bullet Perforation
1983-09-28 Perforation Treatment Performed - Fractured
1983-10-02 Perforation Treatment Performed - Bullet Perforation
1983-10-04 Perforation Treatment Performed - Fractured
1983-11-28 Well Log Performed
1983-11-29 Perforation Treatment Performed - Bullet Perforation
1983-12-01 Perforation Treatment Performed - Fractured
1983-12-11 Well Log Performed
1983-12-12 Perforation Treatment Performed - Bullet Perforation
1984-01-29 Perforation Treatment Performed - Fractured
1984-05-16 Perforation Treatment Performed - Fractured
1986-03-12 Well Began Production
1986-03-12 Well Fluid changed to Gas
1986-03-12 Well Mode changed to Flowing
1998-05-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-21 Bullet Perforation 401.00 403.00 13
1983-09-28 Fracture 401.00 403.00 0
1983-10-02 Bullet Perforation 369.80 371.30 13
1983-10-02 Bullet Perforation 379.20 379.80 10
1983-10-04 Fracture 369.80 379.80 0
1983-11-29 Bullet Perforation 330.60 331.20 8
1983-11-29 Bullet Perforation 322.00 322.60 8
1983-11-29 Bullet Perforation 317.90 319.10 8
1983-11-29 Bullet Perforation 312.30 314.50 10
1983-11-29 Bullet Perforation 309.30 311.40 10
1983-12-01 Fracture 309.30 331.20 0
1983-12-12 Bullet Perforation 281.00 287.30 4
1983-12-12 Bullet Perforation 271.00 278.00 4
1984-01-29 Fracture 271.00 287.30 0
1984-05-16 Fracture 271.00 287.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 192 0.0 0.0 0.0
1984 96 0.0 0.0 0.0
1986 7057 0.0 0.0 0.0
1987 8733 0.0 0.0 0.0
1988 8776 0.0 0.0 0.0
1989 8756 0.0 0.0 0.0
1990 8681 0.0 0.0 0.0
1991 8682 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 2879 0.0 0.0 0.0

For data sources see[5]

References