X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164060806002

Well Details

Well ID: 0164060806002
Loading map...
Location: 00/06-08-016-06W4/2
Location Alias: 00/06-08-16-06 W4M
Location Alias 2: 00/06-08-016-06 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 06
Section: 08
County/Municipality: Cypress County
Well Name: CVE SUFFIELD 6-8-16-6
Operator Name: Ipc Canada Ltd.
License Number: 0066273
License Date: 1977-10-21
License Status: Issued
Spud Date: 1977-11-12
Final Drill Date: 1977-11-16
Well Total Depth: 922.60 m
Surface Hole Latitude: 50.328814
Surface Hole Longitude: -110.800258

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-21 Obtained License
1977-11-15 Kick Occurred
1977-11-16 Finished Drilling
1977-11-17 Drill Stem Test Performed
1977-11-18 Plug Back Performed
1977-11-18 Production Casing Operation Performed
1978-02-15 Perforation Treatment Performed - Jet Perforation
1978-02-16 Perforation Treatment Performed - Fractured
1978-02-20 Perforation Treatment Performed - Jet Perforation
1978-02-21 Perforation Treatment Performed - Fractured
1978-03-03 Perforation Treatment Performed - Fractured
1978-03-03 Perforation Treatment Performed - Jet Perforation
1978-03-03 Perforation Treatment Performed - Selective Jet Perforations
1978-04-29 Well Mode changed to Drilled and Cased
1984-01-02 Well Began Production
1984-01-02 Well Fluid changed to Gas
1984-01-02 Well Mode changed to Flowing
1999-07-01 Well Fluid changed to Gas
1999-07-01 Well Mode changed to Suspended
1999-07-02 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-02-15 Perforation 559.00 561.40 7
1978-03-03 Selective Jet Perforations 299.30 299.90 0
1978-03-03 Perforation 323.10 327.40 3
1978-03-03 Selective Jet Perforations 331.60 332.20 0
1978-03-03 Selective Jet Perforations 334.40 339.20 0
1978-03-03 Selective Jet Perforations 339.80 339.80 0
1978-03-03 Fracture 284.10 339.80 0
1978-02-15 Perforation 563.30 565.70 7
1978-02-16 Fracture 559.00 565.70 0
1978-02-20 Perforation 382.50 385.00 7
1978-02-20 Perforation 392.00 392.60 7
1978-02-20 Perforation 414.80 416.40 7
1978-02-21 Fracture 382.50 416.40 0
1978-03-03 Selective Jet Perforations 284.10 284.70 0
1978-03-03 Selective Jet Perforations 287.70 298.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2092 0.0 0.0 0.0
1985 4078 0.0 0.0 0.0
1986 1910 0.0 0.0 0.0
1987 418 0.0 0.0 0.0
1988 8770 0.0 0.0 0.0
1989 8755 0.0 0.0 0.0
1990 8681 0.0 0.0 0.0
1991 8612 0.0 0.0 0.0
1992 8735 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 4343 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-11-15 Kick 739.10 739.10

For data sources see[6]

References