X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164060706000

Well Details

Well ID: 0164060706000
Loading map...
Location: 00/06-07-016-06W4/0
Location Alias: 00/06-07-16-06 W4M
Location Alias 2: 00/06-07-016-06 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 06
Section: 07
County/Municipality: Cypress County
Well Name: CVE SUFFIELD 6-7-16-6
Operator Name: Ipc Canada Ltd.
License Number: 0046554
License Date: 1973-07-16
License Status: Issued
Spud Date: 1973-07-28
Final Drill Date: 1973-07-29
Well Total Depth: 432.50 m
Surface Hole Latitude: 50.328632
Surface Hole Longitude: -110.822670

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-07-16 Obtained License
1973-07-29 Finished Drilling
1973-07-29 Well Log Performed
1973-07-30 Production Casing Operation Performed
1973-09-15 Perforation Treatment Performed - Fractured
1973-09-15 Perforation Treatment Performed - Jet Perforation
1973-09-16 Perforation Treatment Performed - Bullet Perforation
1973-09-16 Perforation Treatment Performed - Fractured
1974-02-22 Well Mode changed to Drilled and Cased
1978-02-04 Well Began Production
1978-02-04 Well Fluid changed to Gas
1978-02-04 Well Mode changed to Flowing
1978-03-04 Well Fluid changed to Gas
1978-03-04 Well Mode changed to Flowing
1997-12-01 Well Fluid changed to Gas
1997-12-01 Well Mode changed to Flowing
2004-03-01 Well Log Performed
2004-03-28 Perforation Treatment Performed - Fractured
2004-05-26 Well Log Performed
2005-04-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-09-15 Perforation 382.80 384.40 10
2004-03-28 Fracture 391.10 392.60 0
2004-03-28 Fracture 382.80 384.40 0
2004-03-28 Fracture 323.70 328.90 0
2004-03-28 Fracture 298.40 300.20 0
1973-09-15 Perforation 391.10 392.60 10
1973-09-15 Fracture 382.80 392.60 0
1973-09-16 Bullet Perforation 298.40 299.60 3
1973-09-16 Bullet Perforation 299.60 300.20 3
1973-09-16 Bullet Perforation 323.70 325.50 3
1973-09-16 Bullet Perforation 328.30 328.90 3
1973-09-16 Bullet Perforation 336.20 336.20 3
1973-09-16 Fracture 298.40 336.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 6568 0.0 0.0 0.0
1979 7455 0.0 0.0 0.0
1980 8119 0.0 0.0 0.0
1981 7904 0.0 0.0 0.0
1982 8639 0.0 0.0 0.0
1983 8606 0.0 0.0 0.0
1984 8773 0.0 0.0 0.0
1985 8734 0.0 0.0 0.0
1986 8736 0.0 0.0 0.0
1987 8733 0.0 0.0 0.0
1988 8777 0.0 0.0 0.0
1989 8755 0.0 0.0 0.0
1990 8681 0.0 0.0 0.0
1991 8658 0.0 0.0 0.0
1992 8735 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8635 0.0 0.0 0.0
2016 8549 0.0 0.0 0.0
2017 8551 0.0 0.0 0.0
2018 8452 0.0 0.0 0.0
2019 8623 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References