X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164060516000

Well Details

Well ID: 0164060516000
Loading map...
Location: 00/16-05-016-06W4/0
Location Alias: 00/16-05-16-06 W4M
Location Alias 2: 00/16-05-016-06 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 06
Section: 05
County/Municipality: Cypress County
Well Name: CVE SUFFIELD 16-5-16-6
Operator Name: Ipc Canada Ltd.
License Number: 0082271
License Date: 1980-04-22
License Status: Issued
Spud Date: 1980-06-06
Final Drill Date: 1980-06-07
Well Total Depth: 456.00 m
Surface Hole Latitude: 50.321155
Surface Hole Longitude: -110.788806

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-22 Obtained License
1980-06-07 Finished Drilling
1980-06-07 Production Casing Operation Performed
1980-06-07 Well Mode changed to Drilled and Cased
1980-08-07 Perforation Treatment Performed - Jet Perforation
1980-08-13 Perforation Treatment Performed - Fractured
1980-08-17 Perforation Treatment Performed - Jet Perforation
1980-08-24 Perforation Treatment Performed - Fractured
1980-11-09 Well Mode changed to Drilled and Cased
1981-02-19 Well Began Production
1981-02-19 Well Fluid changed to Gas
1981-02-19 Well Mode changed to Flowing
2002-05-01 Well Fluid changed to Gas
2002-05-01 Well Mode changed to Flowing
2004-03-25 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-07 Perforation 375.40 377.20 7
2004-03-25 Fracture 407.70 408.80 0
2004-03-25 Fracture 375.40 377.20 0
2004-03-25 Fracture 326.50 327.20 0
2004-03-25 Fracture 315.00 320.00 0
2004-03-25 Fracture 290.40 291.80 0
2004-03-25 Fracture 275.80 277.00 0
1980-08-07 Perforation 407.70 408.80 7
1980-08-13 Fracture 375.40 408.80 0
1980-08-17 Perforation 275.80 277.00 3
1980-08-17 Perforation 290.40 291.80 3
1980-08-17 Perforation 315.00 317.30 3
1980-08-17 Perforation 318.50 320.00 3
1980-08-17 Perforation 326.50 327.20 3
1980-08-24 Fracture 275.80 327.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 96 0.0 0.0 0.0
1981 7124 0.0 0.0 0.0
1982 8639 0.0 0.0 0.0
1983 8606 0.0 0.0 0.0
1984 8780 0.0 0.0 0.0
1985 8734 0.0 0.0 0.0
1986 8736 0.0 0.0 0.0
1987 8732 0.0 0.0 0.0
1988 8777 0.0 0.0 0.0
1989 8755 0.0 0.0 0.0
1990 8483 0.0 0.0 0.0
1991 8658 0.0 0.0 0.0
1992 8735 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8635 0.0 0.0 0.0
2016 8549 0.0 0.0 0.0
2017 8551 0.0 0.0 0.0
2018 8452 0.0 0.0 0.0
2019 8623 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References