X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164052713002

Well Details

Well ID: 0164052713002
Loading map...
Location: 00/13-27-016-05W4/2
Location Alias: 00/13-27-16-05 W4M
Location Alias 2: 00/13-27-016-05 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 05
Section: 27
County/Municipality: Cypress County
Well Name: CVE SUFFIELD 13-27-16-5
Operator Name: Ipc Canada Ltd.
License Number: 0099714
License Date: 1982-12-13
License Status: Issued
Spud Date: 1982-12-16
Final Drill Date: 1982-12-17
Well Total Depth: 481.00 m
Surface Hole Latitude: 50.381511
Surface Hole Longitude: -110.619245

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-12-13 Obtained License
1982-12-17 Finished Drilling
1982-12-17 Well Mode changed to Drilled and Cased
1982-12-18 Production Casing Operation Performed
1983-09-13 Perforation Treatment Performed - Fractured
1983-09-13 Perforation Treatment Performed - Jet Perforation
1983-09-24 Perforation Treatment Performed - Jet Perforation
1983-10-08 Perforation Treatment Performed - Fractured
1984-07-13 Perforation Treatment Performed - Jet Perforation
1984-07-14 Well Log Performed
1984-08-03 Perforation Treatment Performed - Fractured
1984-10-02 Perforation Treatment Performed - Bullet Perforation
1984-10-03 Well Log Performed
1984-11-09 Well Began Production
1984-11-09 Well Fluid changed to Gas
1984-11-09 Well Mode changed to Flowing
2001-08-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-13 Perforation 437.60 439.10 13
1984-10-02 Bullet Perforation 322.30 322.90 8
1984-10-02 Bullet Perforation 318.90 320.70 10
1984-10-02 Bullet Perforation 315.70 316.60 8
1984-10-02 Bullet Perforation 312.90 314.30 7
1984-10-02 Bullet Perforation 310.50 311.30 8
1983-09-13 Fracture 437.60 439.10 0
1983-09-24 Perforation 407.60 410.00 13
1983-10-08 Fracture 407.60 410.00 0
1984-07-13 Perforation 354.20 355.10 8
1984-07-13 Perforation 350.70 353.40 7
1984-07-13 Perforation 345.50 349.30 7
1984-08-03 Fracture 345.50 355.10 0
1984-10-02 Bullet Perforation 324.60 325.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1363 0.0 0.0 0.0
1985 8753 0.0 0.0 0.0
1986 8755 0.0 0.0 0.0
1987 8734 0.0 0.0 0.0
1988 8782 0.0 0.0 0.0
1989 8752 0.0 0.0 0.0
1990 8711 0.0 0.0 0.0
1991 8713 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 5087 0.0 0.0 0.0

For data sources see[5]

References