X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164052706002

Well Details

Well ID: 0164052706002
Loading map...
Location: 00/06-27-016-05W4/2
Location Alias: 00/06-27-16-05 W4M
Location Alias 2: 00/06-27-016-05 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 05
Section: 27
County/Municipality: Cypress County
Well Name: CVE SUFFIELD 6-27-16-5
Operator Name: Ipc Canada Ltd.
License Number: 0096874
License Date: 1982-07-29
License Status: Issued
Spud Date: 1982-08-10
Final Drill Date: 1982-08-11
Well Total Depth: 472.00 m
Surface Hole Latitude: 50.373150
Surface Hole Longitude: -110.615375

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-07-29 Obtained License
1982-08-11 Finished Drilling
1982-08-11 Production Casing Operation Performed
1982-08-11 Well Mode changed to Drilled and Cased
1982-10-24 Perforation Treatment Performed - Jet Perforation
1982-11-11 Perforation Treatment Performed - Fractured
1982-11-16 Perforation Treatment Performed - Jet Perforation
1982-12-15 Well Began Production
1982-12-15 Well Fluid changed to Gas
1982-12-15 Well Mode changed to Flowing
1998-11-01 Well Structure changed to Commingled
2005-02-05 Perforation Treatment Performed - Jet Perforation
2005-02-08 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-24 Perforation 422.20 423.80 4
2005-02-05 Perforation 344.50 346.50 7
2005-02-05 Perforation 314.20 316.20 7
2005-02-05 Perforation 304.00 306.00 7
2005-02-05 Perforation 283.00 285.00 7
2005-02-08 Fracture 344.50 346.50 0
2005-02-08 Fracture 329.10 336.10 0
2005-02-08 Fracture 314.20 316.20 0
2005-02-08 Fracture 304.00 306.00 0
2005-02-08 Fracture 294.00 295.00 0
2005-02-08 Fracture 283.00 285.00 0
1982-10-24 Perforation 391.70 393.80 10
1982-11-11 Fracture 391.70 423.80 0
1982-11-16 Perforation 294.00 295.00 4
1982-11-16 Perforation 304.90 305.70 5
1982-11-16 Perforation 314.20 314.60 5
1982-11-16 Perforation 329.10 332.80 4
1982-11-16 Perforation 334.80 336.10 4
1982-11-16 Perforation 344.50 345.20 4

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 96 0.0 0.0 0.0
1983 8000 0.0 0.0 0.0
1984 8777 0.0 0.0 0.0
1985 8753 0.0 0.0 0.0
1986 8755 0.0 0.0 0.0
1987 8734 0.0 0.0 0.0
1988 8782 0.0 0.0 0.0
1989 8756 0.0 0.0 0.0
1990 8711 0.0 0.0 0.0
1991 8713 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 7295 0.0 0.0 0.0

For data sources see[5]

References